Will County Board Graphic.03

Will County Approves $2.9 Million Engineering Contract for Bluff Road Reconstruction in Channahon

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The county is advancing a massive overhaul of Bluff Road in Channahon, approving a nearly $3 million Phase I and II engineering contract to prepare the corridor for full reconstruction, storm sewers, and potential retaining walls.

Bluff Road Engineering Key Points:

  • The committee approved a $2,955,607 contract with Peralte-Clark, LLC.

  • The project covers Bluff Road (CH 77) from the I-55 West Frontage Road to US Route 6.

  • The design will convert the existing rural, ditch-lined road into an urban cross-section with curb, gutter, and storm sewers.

  • The contract includes extensive geotechnical and environmental investigations due to the likelihood of encountering shallow bedrock and utility conflicts.

The Will County Board Public Works & Transportation Committee on Tuesday, April 7, 2026, unanimously approved a sweeping $2,955,607 professional services agreement with Peralte-Clark, LLC to engineer the total reconstruction of Bluff Road in Channahon.

The project targets a 5,900-foot, 1.1-mile stretch of Bluff Road (County Highway 77) between US Route 6 and the West Frontage Road of Interstate 55. Currently a two-lane major collector carrying roughly 5,850 vehicles per day, the roadway suffers from pavement deterioration, geometric deficiencies, and drainage issues.

According to the project scope detailed in the agenda packet, Peralte-Clark will guide the project through both Phase I (Preliminary & Environmental Engineering) and Phase II (Design Engineering). The ultimate goal is to convert the existing rural cross-section—characterized by aggregate shoulders and open ditches—into a modernized urban section featuring concrete curbs, gutters, and an enclosed storm sewer system.

The engineering task is highly complex due to the corridor’s specific geography. The contract includes significant subsurface investigations by subconsultants to identify areas of shallow bedrock, which could severely impact drainage design, excavation costs, and the placement of proposed retaining walls.

The Phase I study will evaluate up to four geometric alternatives, including two-lane and three-lane configurations, while also designing pedestrian and bicycle accommodations. The engineering team will also be required to navigate substantial utility conflicts, requiring a dedicated Subsurface Utility Engineering (SUE) evaluation.

The $2.95 million contract will be funded through a combination of County Motor Fuel Tax, RTA Tax, Highway Tax, and Matching Tax funds. According to the preliminary schedule, Phase II design is slated for completion by March 2027, with construction potentially beginning in June 2027.

Today Jun 9
Mostly Sunny then Showers And Thunderstorms Likely
88° 70°

Mostly Sunny then Showers And Thunderstorms Likely

💨 10 to 20 mph 💧 70%

Leave a Comment





Latest News Stories

Screenshot 2025-10-17 at 11.31.38 AM

Lincoln-Way Board Honors Students with Perfect ACT Scores, Music Educator of the Year

LW210 Board of Education Meeting | October 16, 2025 Article Summary: Lincoln-Way District 210 celebrated exceptional academic and faculty achievement by formally recognizing nine students who earned a perfect composite...
Screenshot 2025-11-03 at 11.45.01 AM

New Lenox Locks in Three-Year Fireworks Contract to Stabilize Costs

Village of New Lenox Board of Trustees Meeting | October 13, 2025 Article Summary: The New Lenox Village Board has approved a three-year contract with Pyrotecnico Fireworks, Inc. to secure...
Screenshot 2025-10-17 at 11.32.04 AM

Lincoln-Way Support Staff Union Rejects Tentative Contract Agreement

LW210 Board of Education Meeting | October 16, 2025 Article Summary: Members of the Lincoln-Way Community High School District 210 support staff union have voted down a tentative five-year contract...
new-lenox-township.2

New Lenox Township Explores Land Purchase for Cemetery Expansion

New Lenox Township Board of Trustees Meeting | September Article Summary: New Lenox Township is considering the purchase of church-owned property adjacent to the Maplewood cemetery for a potential expansion....
Meeting Briefs

Meeting Summary and Briefs: Will County Board Legislative Committee for October 7, 2025

The Will County Legislative Committee held a long and contentious meeting on Tuesday, October 7, 2025, highlighted by the narrow 4-3 passage of a controversial resolution supporting protections for immigrant...
Screenshot 2025-11-03 at 11.44.21 AM

Developer Changes Landings Business Center Plan from Two Stories to One

Village of New Lenox Board of Trustees Meeting | October 13, 2025 Article Summary: The New Lenox Village Board has approved a modified site plan for The Landings Business Center,...
Screenshot 2025-10-10 at 12.05.55 PM

Will County Board Committee Passes Contentious ‘Live and Work Without Fear’ Resolution on 4-3 Vote

Will County Legislative Committee Meeting October 7, 2025 Article Summary: The Will County Legislative Committee on Tuesday narrowly passed a controversial resolution affirming the county's commitment to ensuring all residents...
Meeting Briefs

Will County Awards $10.4 Million Contract for Bell Road Widening in Homer Glen Area

Will County Public Works & Transportation Committee Meeting October 7, 2025 Article Summary: The Will County Public Works & Transportation Committee on Tuesday confirmed the award of a $10.4 million...
Screenshot 2025-10-10 at 12.12.16 PM

Meeting Summary and Briefs: Will County Public Works & Transportation Committee for October 7, 2025

The Will County Public Works & Transportation Committee on Tuesday, October 7, 2025, approved a major construction contract and reviewed extensive plans for both county and state transportation initiatives. The...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Finance Committee for October 7, 2025

The Will County Finance Committee on Tuesday, October 7, 2025, held a contentious meeting centered on the county’s finances, narrowly approving a preliminary $161.6 million county-wide tax levy on a...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Capital Improvements & IT Committee for October 7, 2025

The Will County Capital Improvements & IT Committee spent the bulk of its meeting on Tuesday, October 7, 2025, discussing the county’s long-term facilities master plan. Faced with an aging...
Screenshot 2025-11-03 at 11.43.03 AM

New Lenox Waives $38,000 in Fees for Fire District’s $4 Million Station Expansion

Village of New Lenox Board of Trustees Meeting | October 13, 2025 Article Summary: The New Lenox Village Board has unanimously voted to waive $38,000 in building permit and plan...
New Lenox Township.3

New Lenox to Consolidate Meals on Wheels Program with Frankfort Township

New Lenox Township Board of Trustees Meeting | September Article Summary: The New Lenox Township Meals on Wheels program, currently operated from its senior housing building, will be discontinued at...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Public Health & Safety Committee for October 2, 2025

The Will County Public Health & Safety Committee on Thursday, October 2, 2025, heard a mix of alarming and encouraging public health news, as officials reported a dramatic 50% drop...
Screenshot 2025-10-10 at 12.05.41 PM

Will County Shapes 2026 Federal Agenda, Prioritizing Health, Housing, and Workforce Funding

Will County Legislative Committee Meeting October 7, 2025 Article Summary: The Will County Legislative Committee on Tuesday began finalizing its 2026 Federal Legislative Agenda, formally adopting key priorities that include...