Will County Board Graphic.03

Will County Approves $2.9 Million Engineering Contract for Bluff Road Reconstruction in Channahon

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The county is advancing a massive overhaul of Bluff Road in Channahon, approving a nearly $3 million Phase I and II engineering contract to prepare the corridor for full reconstruction, storm sewers, and potential retaining walls.

Bluff Road Engineering Key Points:

  • The committee approved a $2,955,607 contract with Peralte-Clark, LLC.

  • The project covers Bluff Road (CH 77) from the I-55 West Frontage Road to US Route 6.

  • The design will convert the existing rural, ditch-lined road into an urban cross-section with curb, gutter, and storm sewers.

  • The contract includes extensive geotechnical and environmental investigations due to the likelihood of encountering shallow bedrock and utility conflicts.

The Will County Board Public Works & Transportation Committee on Tuesday, April 7, 2026, unanimously approved a sweeping $2,955,607 professional services agreement with Peralte-Clark, LLC to engineer the total reconstruction of Bluff Road in Channahon.

The project targets a 5,900-foot, 1.1-mile stretch of Bluff Road (County Highway 77) between US Route 6 and the West Frontage Road of Interstate 55. Currently a two-lane major collector carrying roughly 5,850 vehicles per day, the roadway suffers from pavement deterioration, geometric deficiencies, and drainage issues.

According to the project scope detailed in the agenda packet, Peralte-Clark will guide the project through both Phase I (Preliminary & Environmental Engineering) and Phase II (Design Engineering). The ultimate goal is to convert the existing rural cross-section—characterized by aggregate shoulders and open ditches—into a modernized urban section featuring concrete curbs, gutters, and an enclosed storm sewer system.

The engineering task is highly complex due to the corridor’s specific geography. The contract includes significant subsurface investigations by subconsultants to identify areas of shallow bedrock, which could severely impact drainage design, excavation costs, and the placement of proposed retaining walls.

The Phase I study will evaluate up to four geometric alternatives, including two-lane and three-lane configurations, while also designing pedestrian and bicycle accommodations. The engineering team will also be required to navigate substantial utility conflicts, requiring a dedicated Subsurface Utility Engineering (SUE) evaluation.

The $2.95 million contract will be funded through a combination of County Motor Fuel Tax, RTA Tax, Highway Tax, and Matching Tax funds. According to the preliminary schedule, Phase II design is slated for completion by March 2027, with construction potentially beginning in June 2027.

Today Jun 9
Mostly Sunny then Showers And Thunderstorms Likely
88° 70°

Mostly Sunny then Showers And Thunderstorms Likely

💨 15 to 20 mph 💧 70%

Leave a Comment





Latest News Stories

'There is no excuse': air traffic controllers, pilots urge Congress to end shutdown

‘There is no excuse’: air traffic controllers, pilots urge Congress to end shutdown

By Thérèse BoudreauxThe Center Square As air traffic controllers and other federal workers missed a full paycheck Tuesday, growing numbers of labor unions and advocacy groups are calling on Congress...
IL state rep: Reckless immigration policies led to fatal crash

IL state rep: Reckless immigration policies led to fatal crash

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – An Illinois state lawmaker blames “reckless immigration policies” after a crash killed Coles County Board Member...
WATCH: Primary election petitions filed; redistricting consideration for veto session

WATCH: Primary election petitions filed; redistricting consideration for veto session

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop highlights some of...
Illinois quick hits: Unemployment estimates little changed; State Fair discounted ticket sales

Illinois quick hits: Unemployment estimates little changed; State Fair discounted ticket sales

By Jim Talamonti | The Center SquareThe Center Square Unemployment estimates little changed The Chicago Fed Real-Time Unemployment Rate Forecast estimates the U.S. Bureau of Labor Statistics monthly unemployment rate...
Ex-CPS investigator says smeared as ‘racist,’ fired over corruption probes

Ex-CPS investigator says smeared as ‘racist,’ fired over corruption probes

By Jonathan Bilyk | Legal NewslineThe Center Square A Hispanic former deputy corruption investigator has accused the Chicago Public Schools of firing her because she refused to relent in investigating...
Illinois quick hits: Group criticizes elections board vote; charges filed in Clark County crash

Illinois quick hits: Group criticizes elections board vote; charges filed in Clark County crash

By Jim Talamonti | The Center SquareThe Center Square Group criticizes elections board vote A government integrity and accountability group says Democratic members of the Illinois State Board of Elections...
WATCH: Illinois veto session to resume with potential taxes and fees on the table

WATCH: Illinois veto session to resume with potential taxes and fees on the table

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Fall veto session is scheduled to resume Tuesday for lawmakers at the Illinois Capitol. State Rep. Marcus...

WATCH: Illinois Democrats talk redistricting to ‘neutralize’ Republicans

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Gov. J.B. Pritzker says Illinois lawmakers are having conversations about changing the state’s congressional map. U.S. House...
Screenshot 2025-10-25 at 12.42.59 PM

Will County Committee Grapples with $8.9 Million Budget Gap After Contentious 0% Tax Levy Vote

Will County Board Finance Committee Meeting | October 21, 2025 Article Summary: The Will County Board Finance Committee held a contentious debate over how to close an $8.9 million budget shortfall...

Meeting Summary and Briefs: Lincoln-Way Community High School District 210 for October 16, 2025

Meeting Summary and Briefs: Lincoln-Way Community High School District 210 for October 16, 2025

LW210 Board of Education Meeting | October 16, 2025 The Lincoln-Way District 210 Board of Education meeting on Thursday, October 16, 2025, was dominated by news that the district's support...
Meeting-Briefs

Meeting Summary and Briefs: New Lenox Township Board of Trustees for September Meeting

New Lenox Township Board of Trustees Meeting | September 11, 2025 The New Lenox Township Board of Trustees meeting on September 11, 2025, which began with a moment of silence...
Screenshot 2025-10-17 at 11.24.23 AM

Lincoln-Way to Purchase New Buses, Add Smaller Vehicles to Address Driver Shortage

LW210 Board of Education Meeting | October 16, 2025 Article Summary: Lincoln-Way District 210 plans to update its transportation fleet by purchasing 28 new gasoline-powered school buses, three activity buses,...
New Lenox Township.2

New Lenox Officials Join Solar Coalition, Explore Potential Resident Rebates

New Lenox Township Board of Trustees Meeting | September Article Summary: New Lenox Township is now involved in a local solar power initiative, with a trustee attending the introductory meeting...
Meeting-Briefs

Meeting Summary and Briefs: Village of New Lenox Board of Trustees for October 13, 2025

Village of New Lenox Board of Trustees Meeting | October 13, 2025 The New Lenox Village Board took several actions to advance public safety, community development, and village events at...