New-Lenox-School-122.6

New Lenox School District 122 Approves $908,900 Equipment Purchase for Tyler Elementary HVAC Overhaul

Spread the love

Meeting Summary and Briefs: New Lenox School District 122 Meeting | August 2025

Article Summary: The New Lenox School District 122 Board of Education has authorized the pre-purchase of $908,900 in HVAC equipment for a major renovation at Tyler Elementary School, slated for the summer of 2026. The total project, estimated at over $8.1 million, will modernize the school’s 1980s-era heating and cooling systems and include numerous other building upgrades.

Tyler HVAC Renovation Key Points:

  • The board approved a $908,900 equipment order through the OMNIA Partners Purchasing Cooperative.

  • The total projected cost for the renovation, including installation and other improvements, is $8,148,000.

  • The project will replace the school’s original 1980 heating infrastructure with a modern, energy-efficient V.R.F. system.

  • Additional upgrades will include new ceilings, dimmable LED lighting, a new Public Address system, and a new Fire Alarm System.

The New Lenox School District 122 Board of Education on Tuesday, August 19, 2025, approved a significant first step in a multi-million dollar renovation of Tyler Elementary School, authorizing the pre-purchase of $908,900 in new HVAC equipment. The total project, with an estimated cost of $8,148,000, aims to completely overhaul the school’s mechanical systems during the summer of 2026.

Business Manager/CSBO Robert Groos explained that the equipment must be purchased well in advance to ensure it is delivered before installation work begins. The district is using the OMNIA Partners Purchasing Cooperative to comply with state purchasing laws while securing competitive pricing.

Rob Wroble of Legat Architects presented the project’s design and timeline to the board, detailing the necessity of the upgrades. “Tyler School relies on the original heating system infrastructure which dates back to 1980 when the building was opened,” Wroble’s presentation noted, identifying Tyler as the last of four older district schools to receive such a modernization.

The current system is supplied by centralized hot water boilers and uses original pneumatic tubing, valves, and thermostats for temperature control. The aging infrastructure also includes two air-cooled condensing units and cabinet unit ventilators that are beyond their life expectancy.

The proposed replacement is a Variable Refrigerant Flow (V.R.F.) mechanical system, which separates heating and cooling from ventilation. This design is more energy-efficient as it reduces the need to pre-heat or cool large amounts of outside air. Instead of a boiler and chiller, the V.R.F. system uses heat pumps and circulates refrigerant through a two-pipe network to fan coil units in each room. The district is already familiar with this technology, as it is currently operating in three other schools.

Benefits of the new system, according to the presentation, include lower operating costs, smaller equipment, and excellent temperature and humidity control, with thermostats located in every room.

Beyond the mechanical overhaul, the project will fund a host of other improvements throughout the school. These include new bookshelves and storage cabinets in every classroom, new ceilings with dimmable LED light fixtures, a new Public Address System, and a new Fire Alarm System.

During the meeting, board members asked clarifying questions about the project’s logistics. Member Al Haring inquired about equipment storage, to which Mr. Wroble confirmed it would be stored off-site by the contractor or a third party. In response to a question from Member Nicole DeGrave, Wroble noted that while different companies installed the V.R.F. systems at other schools, the equipment and warranties are the same, ensuring consistency.

The project timeline calls for the board to approve the final construction contracts in December 2025. Final bond financing options to fund the project will be reviewed and approved by the board later in the fall of 2025.

Leave a Comment





Latest News Stories

Meeting-Briefs

Meeting Summary and Briefs: New Lenox School District 122 Board for Nov. 2025

New Lenox School District 122 Board Meeting | Nov. 2025 The New Lenox School District 122 Board of Education met on Tuesday, November 18, 2025, at the Haven Administration Center....
Will County Board Graphic.02

County Board Approves Women’s Residential Treatment Center in Joliet

Will County Board Meeting | December 18, 2025 Article Summary: The Will County Board unanimously approved zoning changes to allow the Existential Counselor Society to open a women’s residential treatment...
White business owners are biggest share of Illinois' diversity-preferred contract group

White business owners are biggest share of Illinois’ diversity-preferred contract group

By Jared Strong | The Center SquareThe Center Square (The Center Square) – Illinois' initiative to boost the amount of state contract money it awards to businesses owned by racial...
Meeting-Briefs

Meeting Summary and Briefs: New Lenox Village Board for December 15, 2025

New Lenox Village Board Meeting | December 15, 2025 The New Lenox Village Board on Monday, Dec. 15, 2025, met for a regular session focused on infrastructure upgrades, public safety...
new-lenox-township.2

Township Abates $285,000 in Taxes for Senior Housing Bonds

New Lenox Township Board Meeting | Nov. 13, 2025 Article Summary: The Board of Trustees passed a resolution to abate taxes related to the 2002 Senior Housing Bond payment. The...
Meeting Briefs

Meeting Summary and Briefs: Will County Board for December 18, 2025

Will County Board Meeting | December 18, 2025 The Will County Board held its regular meeting on Thursday, December 18, 2025, focusing heavily on land use, transportation infrastructure, and public...
2025 illegal entries in Texas: Nearly half the gotaways reported in previous years

2025 illegal entries in Texas: Nearly half the gotaways reported in previous years

By Bethany BlankleyThe Center Square In President Donald Trump’s first year in office, illegal border crossers in one year in Texas totaled nearly half of gotaways reported in previous years...
Nashville speaker maker plans to move overseas to avoid tariffs

Nashville speaker maker plans to move overseas to avoid tariffs

By Brett RowlandThe Center Square The owner of a storied Nashville speaker company says he'll pay lower taxes by moving overseas, rather than trying to build in the U.S. It's...
Supreme Court could redefine 14th Amendment application

Supreme Court could redefine 14th Amendment application

By Andrew RiceThe Center Square The U.S. Supreme Court will decide a case in 2026 challenging President Donald Trump’s authority to end birthright citizenship. Trump v. Barbara challenges Trump’s executive...
Missouri year in review: capital gains eliminated, Medicaid increased

Missouri year in review: capital gains eliminated, Medicaid increased

By Andrew RiceThe Center Square In 2025, Missouri lawmakers passed legislation to eliminate its capital gains tax, phase out the state income tax and expand Medicaid legislation. The Club for...
2025 in review: Historic border security actions taken by Trump

2025 in review: Historic border security actions taken by Trump

By Bethany BlankleyThe Center Square On the first day of his second term in office, President Donald Trump issued multiple executive orders, followed by multiple policy changes, that in one...
Free speech under fire nearly 300 times in 2025 on campus

Free speech under fire nearly 300 times in 2025 on campus

By Tate MillerThe Center Square Two hundred seventy-four incidents involving interference to free speech have taken place so far on college campuses in 2025, according to FIRE data, an increase...
IL rep: As if Bears 'had a plan to rob the bank' before considering Indiana

IL rep: As if Bears ‘had a plan to rob the bank’ before considering Indiana

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Illinois state rep whose district includes Soldier Field says the Chicago Bears are bluffing by suggesting...
New-Lenox-School-122.5

Ten New Lenox Schools Rated “Commendable” as State Changes Testing Metrics

New Lenox School District 122 Board Meeting | Nov. 2025 Article Summary:Assistant Superintendent Dr. Peggy Cucci presented the annual student achievement report, noting that all ten eligible district schools received...
Screenshot 2025-12-20 at 12.27.17 PM

Lincoln-Way High Schools Maintain Top State Rankings; EL Progress Jumps

Lincoln-Way Community High School District 210 Meeting | December 18, 2025 Article Summary: The 2025 Illinois Report Card data reveals that Lincoln-Way Central and East have maintained "Exemplary" status, while...