Will County P&Z Logo Planning Zoning

Green Garden Solar Project Cleared to Implement Higher “Agrivoltaic” Standards

Spread the love

Will County Planning and Zoning Commission Meeting | May 5, 2026

Article Summary: The Will County Planning and Zoning Commission approved four variances on Tuesday, May 5, 2026, to facilitate “agrivoltaics” at a proposed solar farm in Green Garden Township, allowing native plants to grow up to three feet tall. The decision permits USS Talamh Solar LLC to deviate from standard weed-control ordinances to meet the rigorous requirements of the Illinois Pollinator-Friendly Solar Site Act.

Pollinator Variance Key Points:

  • Specific Approvals: Variances V-26-115 through V-26-118 were approved in 5-2 votes, allowing ground cover height of 36 inches and reducing required mowings from five to four annually.

  • Environmental Justification: The higher growth is required for native Illinois species to self-pollinate, establish deep root systems for soil recharge, and improve water infiltration.

  • Scorecard Compliance: The developer must complete a “solar site scorecard” with the Illinois Department of Natural Resources (IDNR) to be officially recognized as a pollinator-friendly facility.

  • Wildlife Monitoring: As a condition of approval, the developer must work with the Will County Forest Preserve District to document and monitor wildlife mortality incidents on the 90-acre site.

JOLIET — Beyond the debate over solar panels and battery storage, the Will County Planning and Zoning Commission focused on the future of the soil itself on Tuesday, May 5, 2026, granting a series of variances that will transform a 90-acre farm field into a protected pollinator sanctuary.

The applicant, USS Talamh Solar LLC, successfully argued that standard county maintenance codes—which typically require frequent mowing and height limits for “weeds”—are incompatible with the biological needs of native Illinois prairie plants. To qualify for the state’s community solar program, projects must earn “points” via agrivoltaics, the practice of combining solar energy production with agricultural utility.

Scientific Basis for the Request
Harry Marwil, senior developer for US Solar, explained that the facility intends to plant deep-rooted native species underneath the 17,225 solar panels. ” Agrivoltaics would require pollinator plantings to be grown to 36 inches to establish properly,” Marwil testified.

Ryan Mioni, a civil engineer for the developer, added that these plants act as a natural defense against the very drainage issues neighbors fear. “Native pollinators have deep root systems that recharge agricultural soils, help water infiltration, and provide natural weed prevention,” Mioni said. He noted that the plants need the additional height to propagate effectively and self-pollinate.

The commission’s approval (V-26-115 and V-26-117) raises the allowable height of ground cover from the current 13-inch limit to 36 inches for both parcels involved in the project. Additionally, V-26-116 and V-26-118 reduce the mandatory mowing frequency from five times per year to four.

Forest Preserve and Agency Input
The variances were supported by a land-use analysis that noted the surrounding area already consists of agricultural fields where crops such as corn and soybeans frequently exceed 36 inches.

The Forest Preserve District of Will County provided a formal review of the plan. In a letter dated April 16, 2026, Real Estate Manager Em Wilcher encouraged the developer to utilize the IDNR Solar Site Pollinator Establishment and Management Guidelines. Wilcher requested that the site operator monitor the property for bird, mammal, and insect mortality, providing quality photographs and documented locations to the district.

Opposition and Resident Concerns
The variances were not without detractors. Commissioner Roger Bentonhausen and Commissioner Karen Warick provided the two dissenting votes on all four requests.

During public comment, Green Garden Township Supervisor Dean Christophilos argued that the “natural” look of a pollinator field would be a poor fit for a residential area. “It’s going to change the complexity of our township,” Christophilos said, noting the project’s proximity to a hundred-home subdivision.

Resident Melissa Taviger questioned the honesty of the maintenance plan, suggesting that reduced mowing was a cost-saving measure for the developer rather than an environmental benefit. “There are so many inconsistencies with what they’re proposing,” Taviger told the commission.

Ultimately, the board found that the environmental benefits of soil preservation and stormwater management outweighed the aesthetic concerns of the township. The variances passed 5-2, moving the project forward to the full County Board for final deliberation.

Today Jun 12
Mostly Sunny then Slight Chance Showers And Thunderstorms
87° 61°

Mostly Sunny then Slight Chance Showers And Thunderstorms

💨 15 mph 💧 17%

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Summary and Briefs: New Lenox Community Park District for August 2025

New Lenox Community Park District Meeting | August 2025 The New Lenox Community Park District Board of Commissioners reviewed major financial news and celebrated a record-breaking month for its golf...
Pavlov Media

Pavlov Media to Bring New Fiber Internet Option to New Lenox

Village of New Lenox Board of Trustees Meeting | September 22, 2025 Article Summary: The entrance to the Wintrust Crossroads Sports Complex is set to receive a major aesthetic upgrade...
Enbridge Energy

Will County to Pay Enbridge $82,000 to Relocate Pipeline Equipment for Exchange Street Improvements

Article Summary: Will County will reimburse Enbridge Energy for costs associated with relocating its pipeline facilities to make way for roadway improvements on Exchange Street in the Monee and Crete...
diamond shaped orange red reflector street sign that reads road

Laraway Road Widening Project in New Lenox and Frankfort Gets Additional $468,000 for Redesign

Article Summary: The Will County Board approved a supplemental agreement worth $468,374 for additional design and engineering work on the major Laraway Road expansion project. The funds are needed for...
solar panels photovoltaics in solar farm

“Federal Policy Uncertainty” Blamed for Delay of Peotone Solar Farm; County Grants Second Extension

Article Summary: The Will County Board has granted a second permit extension for a solar farm in Peotone Township after the developer, Trajectory Energy Partners, cited "ongoing uncertainty regarding federal...
solar panels photovoltaics in solar farm

Will County Grants Extensions to Five Solar Projects Sold to New Developers

Article Summary: The Will County Board approved first-time permit extensions for five commercial solar projects across Monee, Crete, and Joliet townships, all of which were recently sold to larger energy...
WCO 2025-09-27 at 9.04.10 AM

Will County Board Approves Controversial Drug Recovery Retreat in Crete Township

Article Summary: The Will County Board has approved a special use permit for The Second Story Foundation to operate a long-term residential recovery program for men on a 68-acre horse...
new-lenox-fire-district-stations.3

Winter Start Unlikely for $4 Million New Lenox Fire Station 62 Remodel

New Lenox Fire Protection District Meeting | August 2025 Article Summary: The planned $4 million remodel of New Lenox Fire Station 62 faces a potential delay, as officials indicated a...
LWSRA-Blue-Logo-transparent

New LWSRA Sensory Bus Hits the Road Thanks to $30,000 Donation

New Lenox Community Park District Meeting | August 2025 Article Summary: The Lincoln-Way Special Recreation Association's new Sensory Bus is officially in service and has been well-received at community events....
Joliet-Junior-college.-Graphic-Logo.4

Joliet Junior College Honors Seven Long-Serving Employees Upon Retirement

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College Board of Trustees formally recognized seven long-serving employees who are retiring, including Dr. Robert "Bob"...
New-Lenox-School-122.3

New Lenox Parent Challenges Busing Fee, Cites Safety Concerns and Budget Surplus

Meeting Summary and Briefs: New Lenox School District 122 Meeting | August 2025 Article Summary: A New Lenox parent addressed the School District 122 board to protest a $350 busing...
Screenshot 2025-11-03 at 11.39.46 AM

New Lenox Demands Over $422,000 From Developer to Complete Public Improvements

Village of New Lenox Board of Trustees Meeting | September 22, 2025 Article Summary: The Village of New Lenox is taking formal action to secure funds for unfinished public infrastructure...
new-lenox-fire-district-stations.4

New Lenox Fire District Pays Off Final Loan, Secures $75,000 State Grant

New Lenox Fire Protection District Meeting | August 2025 Article Summary: The New Lenox Fire Protection District has achieved a significant financial milestone by making the final payment on its...
New-Lenox-Sharons-Bay-Park

Damaged Drain Tiles at Bristol Park Face $107,000 Repair Bill

New Lenox Community Park District Meeting | August 2025 Article Summary: A comprehensive survey of the drainage system at Bristol Park has revealed that all of the clay tiles are...
Screenshot 2025-11-03 at 11.31.47 AM

New Lenox and Homer Glen Renew 20-Year Boundary Agreement, Defining Future Growth

Village of New Lenox Board of Trustees Meeting | September 22, 2025 Article Summary: The New Lenox Village Board has approved a new 20-year intergovernmental boundary agreement with the Village...