Will County Board Graphic.04

Board Establishes New Regulations and Fees for Wireless Telecommunication Facilities

Spread the love

Will County Board Meeting | April 16, 2026

Article Summary: In response to the state’s Small Wireless Facilities Deployment Act, the Will County Board passed Ordinance 26-134 to manage the collocation of small cell towers and wireless equipment within county rights-of-way.

Wireless Telecommunication Facilities Key Points:

  • Sets a $450 application fee for a single wireless facility on an existing structure.

  • Mandates an annual recurring rate of $200 per location for facilities placed on county-owned infrastructure.

  • Limits above-ground ancillary equipment volume to 25 cubic feet.

The Will County Board on Thursday, April 16, 2026, unanimously passed Ordinance 26-134, establishing Chapter 122 of the Business Regulations to oversee Wireless Telecommunication Facilities. The 20-0 vote formalizes the county’s permitting process and fee structure in alignment with the Illinois Small Wireless Facilities Deployment Act (50 ILCS 840).

The ordinance grants the Will County Division of Transportation the authority to regulate where and how telecommunication providers install new equipment, particularly “small cell” nodes used to boost cellular and Wi-Fi networks.

According to the approved text, companies must pay a $450 non-refundable application fee to collocate a facility on an existing structure. If the equipment is mounted on county-owned infrastructure, such as a traffic signal or streetlight, the provider must pay an annual recurring fee of $200 per location, or an amount equal to the county’s direct costs, whichever is greater.

The legislation mandates strict physical limitations to prevent visual clutter and right-of-way hazards. Antennas attached to existing structures cannot exceed ten feet above the tallest existing structure within 300 feet, or a maximum height of 45 feet above ground level. Furthermore, the total combined volume of all above-ground equipment (excluding the antenna, meters, and connection cables) is capped at 25 cubic feet.

To protect county assets, providers must submit a structural integrity analysis prepared by a licensed Illinois engineer ensuring the pole can handle wind and ice loads. Providers are completely financially responsible for any damage caused to county infrastructure during installation or maintenance and must provide a $20,000 performance bond to guarantee right-of-way restoration.

Violations of the chapter, including unauthorized installations or failure to remove abandoned equipment, will result in fines of $750 or twice the assessed application fee, whichever is greater, per day.

Leave a Comment





Latest News Stories

Meeting Briefs

Meeting Summary and Briefs: Lincoln-Way District 210 Board of Education for February 19, 2026

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 NEW LENOX – The Lincoln-Way Community High School District 210 Board of Education met on Thursday, February 19, 2026, to...
Will County Board Graphic.04

County Approves $1.9 Million for Wilmington-Peotone Road Engineering

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board authorized nearly $2 million in Motor Fuel Tax funds to begin Phase I design engineering for improvements...
Police Crime

County Board Authorizes Audit of Homer Glen Policing Contract; Officials Seek ‘True Cost’ of Services

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board unanimously approved a $75,000 contract to audit the cost of law enforcement services provided to the Village...
solar panels photovoltaics in solar farm

Soltage Drops Battery Storage Plans, Secures Extensions for Two Crete Solar Projects

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board granted second extensions to special use permits for two solar energy projects in Crete Township. The developer,...
Will County Board Graphic.02

Scrap Metal Drop-Off Near Mokena Approved by Single Vote

Will County Board Meeting | February 19, 2026 Article Summary: A contested proposal for an outdoor recyclable material drop-off facility in Frankfort Township passed by a single vote following objections from...
Will County Board Graphic.01

Landscape Business Approved on Cedar Road Despite ‘Dangerous Curve’ Concerns

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board approved a special use permit for a landscape business on Cedar Road in Homer Glen, despite concerns...
Screenshot 2026-05-10 at 3.41.28 PM

New Lenox and Manhattan Approve Updated 20-Year Jurisdictional Boundary Agreement

New Lenox Village Board of Trustees Meeting | February 23, 2026 Article Summary: The Village of New Lenox formally adopted an updated Intergovernmental Cooperative Planning and Jurisdictional Boundary Agreement with...
Committee-Ad-Hoc.Graphic

Meeting Summary and Briefs: Will County Ad-Hoc Ordinance Review Committee for February 10, 2026

Will County Ad-Hoc Ordinance Review Committee Meeting | February 10, 2026 Meeting SummaryThe Will County Board Ad-Hoc Ordinance Review Committee met on Tuesday, February 10, 2026, to continue its comprehensive...
Committee-Land Use.Graphic

Meeting Summary and Briefs: Will County Land Use & Development Committee for February 5, 2026

Will County Land Use & Development Committee Meeting | February 5, 2026 The Will County Land Use and Development Committee met on Thursday, February 5, 2026, to deliberate on several...
Screenshot 2026-02-22 at 5.06.42 PM

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for February 18, 2026

Joliet Junior College Board of Trustees Meeting | February 18, 2026 Meeting SummaryThe Joliet Junior College Board of Trustees met on Wednesday, February 18, 2026, for a regular meeting dominated...
Committee-Executive.Graphic

Meeting Summary and Briefs: Will County Executive Committee for February 11, 2026

Will County Executive Committee Meeting | February 11, 2026 Meeting SummaryThe Will County Board Executive Committee met on Wednesday, February 11, 2026, tackling a heavy agenda focused on economic development...
Screenshot 2026-02-22 at 4.29.56 PM

Advisory Committee Debates Rigor of Online Summer School Options

Lincoln-Way District 210 Board of Education Meeting | February 19, 2026 Article Summary: The District 210 Advisory Committee reported on discussions regarding the potential expansion of online summer school offerings,...
Election Vote Graphic

Group Presents Allegations of 2024 Voter Roll Errors to County Board

Will County Board Meeting | February 19, 2026 Article Summary: The Will County Board approved a resolution calling for the review of election systems and integrity, following public comments alleging inaccuracies...
Screenshot 2026-05-10 at 3.41.28 PM

New Lenox Injects Over $250,000 into Crossroads Sports Complex Upgrades and Secures Major Tournament Contracts

New Lenox Village Board of Trustees Meeting | February 23, 2026 Article Summary: To maximize utility and revenue at the Crossroads Sports Complex, the New Lenox Village Board authorized substantial...
Will County Board Graphic.04

Will County Board Advised on Strict “Judicial” Role Ahead of Landfill Expansion Application

Will County Landfill Committee Meeting | February 10, 2026 Article Summary: During a detailed legal briefing on Tuesday, the Will County Landfill Committee received strict instructions regarding their conduct during...