Screenshot 2026-05-10 at 4.26.42 PM

New Lenox Board Green-Lights Final Plat and $2.75 Million Surety for Spencer Meadows Subdivision

Spread the love

New Lenox Village Board of Trustees Meeting | April 13, 2026

Article Summary: The Village of New Lenox finalized the zoning, platting, and financial guarantees for the Spencer Meadows residential development. The 55-lot subdivision will introduce 53 “cottage homes” and two larger estate-style lots, supported by a $2.75 million developer surety for public improvements.

Spencer Meadows Key Points:

  • Development Scope: The subdivision includes 53 cottage homes (minimum 7,000 square feet lots) and two larger lots mirroring the adjacent Ashton Estates.

  • Housing Standards: All homes will have a minimum of 1,600 square feet of living space and feature first-floor brick construction.

  • Financial Surety: The Board approved a $2,753,828.57 surety to guarantee the completion of on-site public improvements.

  • Phased Construction Permits: The approved ordinance allows the developer to pull building permits on the west side of the property while finishing infrastructure improvements on the east side.

The New Lenox Village Board on Monday, April 13, 2026, approved a comprehensive legislative package clearing the way for the Spencer Meadows subdivision, setting zoning standards and finalizing over $2.75 million in financial sureties.

The Board passed an ordinance granting a special use for the final Planned Unit Development (PUD) plat for Spencer Meadows, located south of Laraway Road and west of Spencer Road. Community Development Director Robin Ellis reported that while the developer originally proposed building the subdivision in two phases, the final plat encompasses the entire development at once.

The neighborhood will feature 55 residential lots. Two of the lots will be larger to closely match the properties in the Ashton Estates subdivision to the south. The remaining 53 lots will feature “cottage homes,” utilizing lots with a minimum width of 61 feet and an overall area of just over 7,000 square feet.

“These are some examples of the variety of floor plans,” Ellis said, presenting the designs to the Board. “They’re predominantly ranches, but some models would have an optional loft or bedroom upstairs. But they would all comply… their minimum is 1,600 square feet, and they would all have first-floor brick.”

Because the developer combined the phases, they requested the ability to pull building permits before all public improvements across the entire site are complete. The approved ordinance outlines specific requirements, mandating that the off-site water main and the water main through the subdivision be installed first. However, the developer will be allowed to begin building on the western portion of the property while finishing Jack’s Trail—the curved road leading out to Spencer Road—on the east.

To protect the Village’s interests, Operations Director Brian Williams presented a developer surety for the on-site public improvements. The Board voted to approve the surety in the amount of $2,753,828.57.

In a related action, the Board also unanimously approved a plat of easement for an off-site storm sewer running through an adjacent property not included in the Spencer Meadows development footprint. All measures were approved in 6-0 roll call votes.

Leave a Comment





Latest News Stories

WATCH: Trump calls Pritzker ’nothing’ in public safety push; U.S. Rep. Mary Miller live

WATCH: Trump calls Pritzker ’nothing’ in public safety push; U.S. Rep. Mary Miller live

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop airs the latest...
Illinois quick hits: Three dead outside Berwyn school; steady economic conditions reported

Illinois quick hits: Three dead outside Berwyn school; steady economic conditions reported

By Jim Talamonti | The Center SquareThe Center Square Three dead outside Berwyn school A Berwyn middle school is closed for instruction today after three people died in what authorities...
New Lenox Township.2

New Lenox Township Approves 12.5% Increase for Employee Health Insurance

New Lenox Township Board of Trustees Meeting | August 14, 2025 Article Summary: The New Lenox Township Board of Trustees has approved the renewal of its employee medical benefit program...
Joliet-Junior-college.-Graphic-Logo.2

Joliet Junior College, City of Joliet to Explore Joint Public Safety Institute

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College (JJC) Board of Trustees approved an intergovernmental agreement with the City of Joliet to begin...
WATCH: Illinois prison mail scanning rule faces lawmaker scrutiny

WATCH: Illinois prison mail scanning rule faces lawmaker scrutiny

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Emergency rules from the Illinois Department of Corrections to scan inmate mail are under review by...
new-lenox-township.2

New Lenox Scout Prompts Multi-Agency Action on Neighborhood Traffic Safety

New Lenox Township Board of Trustees Meeting | August 14, 2025 Article Summary: A presentation by a local Life Scout regarding speeding and traffic safety concerns in his neighborhood prompted...
Meeting Briefs

Meeting Summary and Briefs: Village of New Lenox Board of Trustees for September 2025

Village of New Lenox Board of Trustees Meeting | September 2025 The New Lenox Village Board on September 8, 2025, approved a crucial extension for the sale of village-owned property...
Screenshot 2025-11-03 at 11.30.16 AM

New Lenox Approves Nearly $43,000 in New Kitchen Equipment for Crossroads Sports Complex

Village of New Lenox Board of Trustees Meeting | September 2025 Article Summary: The New Lenox Village Board has approved the purchase of nearly $43,000 in new food service equipment...
Screenshot 2025-11-03 at 11.28.33 AM

New Lenox Extends Deadline for Sale of Maple Street Property

Village of New Lenox Board of Trustees Meeting | September 2025 Article Summary: The New Lenox Village Board has granted an extension to EMS Properties, LLC, for the purchase of...
Joliet-Junior-college.-Graphic-Logo.3

JJC Moves Forward with Major Technology Overhaul to Modernize College Operations

Article Summary: The Joliet Junior College Board of Trustees received a detailed update on a sweeping Enterprise Resource Planning (ERP) project, a major initiative designed to modernize the college's core...
Joliet-Junior-college.-Graphic-Logo.2

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for August 20, 2025

The Joliet Junior College Board of Trustees focused on a major technological overhaul, celebrated milestones in student support, and addressed internal governance issues at its regular meeting on August 20,...
Joliet-Junior-college.-Graphic-Logo.4

Tensions Flare as JJC Chairman Rebukes “Entitlement” After Trustee Lists Demands

Article Summary: Apparent tensions on the Joliet Junior College Board of Trustees surfaced during its meeting on Wednesday, August 20, 2025, when one trustee requested to be returned to "good...
Meeting-Briefs

Meeting Summary and Briefs: Village of New Lenox Board of Trustees for August 2025

Village of New Lenox Board of Trustees Meeting | August 2025 The New Lenox Village Board's agenda on August 25, 2025, was dominated by a lengthy and contentious public discussion...
fall-festival-b2adf834-992f-4ebd-ac09-edfc1d11b40a-circle

Your Ultimate Guide to the 2025 Frankfort Fall Fest: Everything to Know for the Nationally-Ranked Event

FRANKFORT, IL – The heart of historic downtown Frankfort is set to transform into a vibrant hub of art, music, and community spirit for the 57th annual Frankfort Fall Festival. Running...
Screenshot 2025-11-03 at 11.22.02 AM

New Lenox Board Gives Green Light to 30-Acre Solar Farm Proposal

Village of New Lenox Board of Trustees Meeting | August 2025 Article Summary: The New Lenox Village Board voted not to object to a Will County special use permit for...