Screenshot 2026-05-10 at 4.26.42 PM

New Lenox Board Green-Lights Final Plat and $2.75 Million Surety for Spencer Meadows Subdivision

Spread the love

New Lenox Village Board of Trustees Meeting | April 13, 2026

Article Summary: The Village of New Lenox finalized the zoning, platting, and financial guarantees for the Spencer Meadows residential development. The 55-lot subdivision will introduce 53 “cottage homes” and two larger estate-style lots, supported by a $2.75 million developer surety for public improvements.

Spencer Meadows Key Points:

  • Development Scope: The subdivision includes 53 cottage homes (minimum 7,000 square feet lots) and two larger lots mirroring the adjacent Ashton Estates.

  • Housing Standards: All homes will have a minimum of 1,600 square feet of living space and feature first-floor brick construction.

  • Financial Surety: The Board approved a $2,753,828.57 surety to guarantee the completion of on-site public improvements.

  • Phased Construction Permits: The approved ordinance allows the developer to pull building permits on the west side of the property while finishing infrastructure improvements on the east side.

The New Lenox Village Board on Monday, April 13, 2026, approved a comprehensive legislative package clearing the way for the Spencer Meadows subdivision, setting zoning standards and finalizing over $2.75 million in financial sureties.

The Board passed an ordinance granting a special use for the final Planned Unit Development (PUD) plat for Spencer Meadows, located south of Laraway Road and west of Spencer Road. Community Development Director Robin Ellis reported that while the developer originally proposed building the subdivision in two phases, the final plat encompasses the entire development at once.

The neighborhood will feature 55 residential lots. Two of the lots will be larger to closely match the properties in the Ashton Estates subdivision to the south. The remaining 53 lots will feature “cottage homes,” utilizing lots with a minimum width of 61 feet and an overall area of just over 7,000 square feet.

“These are some examples of the variety of floor plans,” Ellis said, presenting the designs to the Board. “They’re predominantly ranches, but some models would have an optional loft or bedroom upstairs. But they would all comply… their minimum is 1,600 square feet, and they would all have first-floor brick.”

Because the developer combined the phases, they requested the ability to pull building permits before all public improvements across the entire site are complete. The approved ordinance outlines specific requirements, mandating that the off-site water main and the water main through the subdivision be installed first. However, the developer will be allowed to begin building on the western portion of the property while finishing Jack’s Trail—the curved road leading out to Spencer Road—on the east.

To protect the Village’s interests, Operations Director Brian Williams presented a developer surety for the on-site public improvements. The Board voted to approve the surety in the amount of $2,753,828.57.

In a related action, the Board also unanimously approved a plat of easement for an off-site storm sewer running through an adjacent property not included in the Spencer Meadows development footprint. All measures were approved in 6-0 roll call votes.

Leave a Comment





Latest News Stories

Arizona recommends measles vaccine during outbreak

Arizona recommends measles vaccine during outbreak

By Chris WoodwardThe Center Square Arizona is recommending vaccinations to combat the state's worst measles outbreak since the 1990s. The latest update this week showed the state has 111 cases...
Govt. shutdown leads to over 800 flights cancelled, number growing

Govt. shutdown leads to over 800 flights cancelled, number growing

By Thérèse BoudreauxThe Center Square As the government shutdown drags into its 38th day and forced flight reductions begin taking effect, the number of daily flight cancellations Americans are experiencing...
Illinois approves $1.5B transit package, funding for long-delayed projects

Illinois approves $1.5B transit package, funding for long-delayed projects

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Illinois lawmakers approved a $1.5 billion transit package, including long-delayed Moline-to-Chicago rail, hailed by Democrats as...
Supreme Court allows Trump to withhold partial SNAP payment

Supreme Court allows Trump to withhold partial SNAP payment

By Brett RowlandThe Center Square The Supreme Court said Friday that the Trump administration could withhold a partial payment for the federal food benefits program amid the longest-ever government shutdown....
Illinois quick hits: State EPA looks to fund EV charging stations; Tax Foundation says mayor's proposal would hinder employment;

Illinois quick hits: State EPA looks to fund EV charging stations; Tax Foundation says mayor’s proposal would hinder employment;

By Jim Talamonti | The Center SquareThe Center Square State EPA looks to fund EV charging stations The Illinois Environmental Protection Agency (EPA) has announced an Electric Vehicle (EV) Charging...
Congressional Perks: Committees, caucuses cost $50 million since 2019

Congressional Perks: Committees, caucuses cost $50 million since 2019

By Arthur KaneThe Center Square Since 2019, partisan and special interest caucuses and coalitions in the U.S. House spent at least $50 million for staff, food, travel and other expenses,...
Screenshot 2025-11-06 at 4.17.15 PM

Federal Lobbyists Brief Will County on Government Shutdown, Warn of SNAP and TSA Disruptions

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: Will County’s federal lobbyists reported that the ongoing government shutdown, now the longest in U.S. history, is...
New-Lenox-Village-Board.2

New Lenox Residents Plead for Help in Escalating Neighborhood Dispute

New Lenox Village Board Meeting | October 27, 2025 Article Summary: A New Lenox couple made an emotional plea to the Village Board, detailing a year-long dispute with a neighbor that...
Will County Logo Graphic

Commission Approves Mokena-Area Garage Variance Over Village’s Objection

Will County Planning and Zoning Commission Meeting | November 4, 2025 Article Summary: The Will County Planning and Zoning Commission approved a variance for a new garage in unincorporated Frankfort Township...
Screenshot 2025-11-05 at 4.02.49 PM

Will County Committee Advances Gougar Road Bridge Project with Over $540,000 in Agreements

Will County Public Works & Transportation Committee Meeting | November 2025 Article Summary: The Will County Board approved two key agreements for the Gougar Road bridge project in New Lenox,...
Joliet-Junior-college.-Graphic-Logo.4

JJC Receives Surprise $1.9 Million from IRS Employee Retention Credit

Joliet Junior College Board of Trustees Meeting | October 15, 2025 Article SummaryJoliet Junior College has received an unexpected $1.9 million windfall from the federal Employee Retention Credit (ERC), a...
Joliet-Junior-college.-Graphic-Logo.2

JJC Advances ERP Modernization with New Vendor and Two-Year Budget

Joliet Junior College Board of Trustees Meeting | October 15, 2025 Article SummaryJoliet Junior College is entering the next phase of its Enterprise Resource Planning (ERP) system overhaul, with the...
new-lenox-fire-district-stations.3

Station 62 Remodel Advances as Fire District Seeks to Waive Permit Fees

New Lenox Fire Protection District Meeting | September 2025 Article Summary: The planned remodel of New Lenox Fire Station 62 is moving into its next phase, with officials having completed...
Screenshot 2025-11-06 at 4.17.02 PM

Will County Committee Shapes 2026 Legislative Agendas on Housing, Energy, and Health

Meeting Summary and Briefs: Will County Legislative Committee for November 4, 2025 Article Summary: The Will County Legislative Committee advanced key priorities for its 2026 state and federal legislative agendas, focusing...
New-Lenox-School-122.3

New Lenox School District 122 Considers Community Solar Program Promising $55K in Annual Savings

New Lenox School District 122 Meeting | September 2025 Article Summary: New Lenox School District 122 is exploring a 20-year subscription to a community solar program that could save the...