Traffic Alert: Wolf Road water repairs rescheduled for Tuesday
MOKENA – Drivers traveling through Mokena should prepare for delays on Wolf Road tomorrow, as village officials have rescheduled planned water system repairs.
The Village of Mokena announced that the infrastructure work, originally slated for Monday, has been moved to Tuesday, Feb. 3. Crews will be performing repairs on the west side of Wolf Road, specifically along the stretch between Platner Drive and the Hickory Creek Bridge.
Work is scheduled to begin at approximately 9:00 a.m. and is expected to be completed by the end of the day.
During the repair operations, one lane of traffic will be temporarily closed in the area. While traffic flow will be maintained in both directions, officials warn that drivers should expect congestion.
The Village encourages motorists to utilize alternate routes if possible. Those who must travel through the work zone are advised to exercise increased caution to ensure the safety of the construction crews.
Latest News Stories
‘There is no excuse’: air traffic controllers, pilots urge Congress to end shutdown
IL state rep: Reckless immigration policies led to fatal crash
WATCH: Primary election petitions filed; redistricting consideration for veto session
Illinois quick hits: Unemployment estimates little changed; State Fair discounted ticket sales
Ex-CPS investigator says smeared as ‘racist,’ fired over corruption probes
Illinois quick hits: Group criticizes elections board vote; charges filed in Clark County crash
WATCH: Illinois veto session to resume with potential taxes and fees on the table
WATCH: Illinois Democrats talk redistricting to ‘neutralize’ Republicans
Will County Committee Grapples with $8.9 Million Budget Gap After Contentious 0% Tax Levy Vote
Meeting Summary and Briefs: Lincoln-Way Community High School District 210 for October 16, 2025
Meeting Summary and Briefs: New Lenox Township Board of Trustees for September Meeting