Traffic Alert: Wolf Road water repairs rescheduled for Tuesday
MOKENA – Drivers traveling through Mokena should prepare for delays on Wolf Road tomorrow, as village officials have rescheduled planned water system repairs.
The Village of Mokena announced that the infrastructure work, originally slated for Monday, has been moved to Tuesday, Feb. 3. Crews will be performing repairs on the west side of Wolf Road, specifically along the stretch between Platner Drive and the Hickory Creek Bridge.
Work is scheduled to begin at approximately 9:00 a.m. and is expected to be completed by the end of the day.
During the repair operations, one lane of traffic will be temporarily closed in the area. While traffic flow will be maintained in both directions, officials warn that drivers should expect congestion.
The Village encourages motorists to utilize alternate routes if possible. Those who must travel through the work zone are advised to exercise increased caution to ensure the safety of the construction crews.
Latest News Stories
Don’t count on lower electricity prices in 2026
District 122 Authorizes $8 Million in Bonds for HVAC; Partners with Park District on Playgrounds
Lincoln-Way Board Approves $731,000 Freshman Laptop Purchase
Monee Solar Farm Projects Granted Extensions
WATCH: Report: Americans are still paying off credit debt from last Christmas
Congressional Conflicts: Curb on lawmakers’ stock trades draws fire for being weak
Wyoming’s year in review: Education savings, contentious spending
U.S. House advances GOP-backed energy reliability bill
Illinois’ safe gun storage law goes into effect Jan. 1
New Lenox School Board Approves “Balloon” Tax Levy; Actual Increase Expected at 4.7%
New Lenox Township Sets Preliminary Tax Levies; No Public Hearing Required
Frankfort Man Arrested in Gas Station Robbery Found Hiding in McDonald’s Restroom