Engineering Firm Hired for Gougar Road Bridge Replacement
Will County Board Meeting | November 2025
Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian National Railroad in New Lenox. The project aims to improve safety and traffic flow at a critical infrastructure point.
Gougar Road Bridge Key Points:
-
Project: Phase II Design Engineering for the Gougar Road Bridge (County Highway 52).
-
Location: Gougar Road over the Canadian National (CN) Railroad tracks in New Lenox Township.
-
Cost: $301,703.00.
-
Contractor: A. Epstein and Sons International, Inc.
-
Scope: The firm will design a new structure and roadway approaches to replace the existing infrastructure.
JOLIET – Will County is moving forward with plans to replace the Gougar Road bridge over the Canadian National Railroad in New Lenox, authorizing a significant engineering contract on Thursday.
The Board approved a supplemental professional services agreement with A. Epstein and Sons International, Inc. valued at $301,703. The firm is tasked with “Phase II” design engineering, which involves creating the final contract plans, easement documents, and right-of-way plats necessary for construction.
The project targets a section of Gougar Road (County Highway 52) that serves as a key artery in District 2. The current structure over the CN tracks has been identified for replacement to meet modern traffic and safety standards.
Funding for the engineering work will come from a combination of sources, potentially including the Illinois Commerce Commission Grade Crossing Protection Fund, County RTA Tax funds, and County Motor Fuel Tax funds.
This design phase is a critical precursor to construction. Once A. Epstein and Sons completes the structural and roadway design, the county will be positioned to bid the project for construction, likely in a future fiscal year.
Latest News Stories
Land Use Committee Rejects Shorewood Solar Farm Despite 25-Year Lease Offer
Trustees Renew Federal Lobbyist Contract Following $800,000 Funding Win
Executive Committee Advances $28.7 Million BNSF Bridge Project for Lorenzo Road
Meeting Summary and Briefs: New Lenox School District 122 for January 20, 2026
Meeting Summary and Briefs: New Lenox Fire Protection District Board of Trustees for January 19, 2026
Land Use Committee: ‘Clean Fill’ Proposal Stalls After Unauthorized Tree Removal Sparks Environmental Concerns
Contracts Approved for New West Principal and District Technology Director
New Lenox Village Board Approves $250,000 Digital Marketing Agreement to Promote Key Brands
Meeting Summary and Briefs: Will County Planning and Zoning Commission for February 17, 2026
Board Approves New Chief of Staff and Dean Roles; Trustees Clash Over Hiring Transparency
Green Garden Township Residents Threaten Incorporation to Block 6,000-Acre Solar Farm
New Lenox 122 Celebrates Art Program’s 20th Anniversary, Honors VFW Award Winners