Screenshot 2025-11-05 at 4.02.49 PM

Will County Committee Advances Gougar Road Bridge Project with Over $540,000 in Agreements

Spread the love

Will County Public Works & Transportation Committee Meeting | November 2025

Article Summary: The Will County Board approved two key agreements for the Gougar Road bridge project in New Lenox, authorizing over $300,000 for supplemental design engineering and an estimated $240,000 to reimburse Nicor Gas for relocating facilities.

Gougar Road Project Key Points:

  • A supplemental agreement of $301,703 was approved with A. Epstein and Sons International, Inc. for expanded Phase II design engineering services.

  • An agreement was authorized to reimburse Nicor Gas Company for an estimated $240,000 to move its facilities for the Gougar Road (CH 52) bridge project over the CN Railroad.

The Will County Board on Tuesday, November 4, 2025, pushed a major infrastructure project in New Lenox forward by unanimously approving two agreements totaling more than half a million dollars for the proposed Gougar Road bridge over the CN Railroad.

The board authorized a supplemental professional services agreement with A. Epstein and Sons International, Inc. for $301,703. The funds will cover expanded Phase II design engineering services for the project, which is located in County Board District #2. According to project documents, the supplemental work includes redesigning the bridge from a three-span to a four-span structure to avoid relocating an adjacent Nicor facility, extending project limits, and designing a water main relocation for the Village of New Lenox.

In a related action, the board approved a second agreement to reimburse Northern Illinois Gas Company (Nicor) for the actual costs of relocating its gas facilities to accommodate the bridge construction. The estimated cost for Nicor’s work is $240,000. This reimbursement is necessary as Nicor holds a superior right to its existing easement where the county improvements are planned.

Both measures passed without opposition, signaling the board’s continued commitment to the grade separation project, which aims to improve traffic flow and safety on Gougar Road.

Leave a Comment





Latest News Stories

Screenshot 2025-11-27 at 7.18.58 PM

New Lenox Approves 24/7 Cybersecurity Monitoring

Village of New Lenox Meeting | Nov. 24, 2025 Article Summary: The New Lenox Village Board approved a new contract for around-the-clock cybersecurity detection and response to protect village financial...
Weather-Winter

New Lenox Buried Under 12.3 Inches of Snow; Sub-Zero Cold Snap Approaching Friday

Article Summary: New Lenox residents are digging out from a major winter storm that dropped more than a foot of snow over the weekend. The active weather pattern is forecast...
Will County Board Graphic.01

Frankfort Turns to County for Wildlife & Dangerous Animal Control

Will County Board Meeting | November 2025 Article Summary: The Village of Frankfort has entered into a two-year agreement with Will County Animal Protection Services to handle calls regarding bats...
joliet junior college foundation

JJC Foundation Director Kristin Mulvey to Retire After 25 Years of Transformative Leadership

Joliet Junior College Meeting | November 12, 2025 Article Summary:Kristin Mulvey, the longtime Executive Director of Institutional Advancement and the JJC Foundation, was honored by the Board of Trustees as...
nl-food-pantry-horizontal___22114454354

New Lenox Township Hires Full-Time Maintenance Position Amid Surging Food Pantry Demand

New Lenox Township Meeting | October 2025 Article Summary: The New Lenox Township Board of Trustees unanimously approved the creation of a new full-time maintenance position to help manage the...
under armor logo

Lincoln-Way 210 Switches to Under Armour for Athletic Apparel

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: The Lincoln-Way District 210 Board of Education has approved a new 3.5-year agreement with BSN and Under Armour...
Screenshot 2025-11-27 at 7.18.21 PM

Baldermann Defends Investment Strategy, Blasts Social Media Critics

Village of New Lenox Meeting | Nov. 24, 2025 Article Summary: New Lenox Mayor Tim Baldermann issued a fiery defense of the Village Board's decision to suspend the property tax...
Will County Logo Graphic

Crete “Group Care” Home Approved for Senior Living

Will County Board Meeting | November 2025 Article Summary: The Will County Board unanimously approved a special use permit for a senior group care home in Crete Township. The facility...
Meeting Briefs

Meeting Summary and Briefs: New Lenox School District 122 for October 21, 2025

New Lenox School District 122 Meeting | October 21, 2025 The New Lenox School District 122 Board of Education held a public hearing and subsequently approved the issuance of up...
About Us Website Header - 1

New Lenox Library Reviews Strategic Plan Draft Following Robust Community Feedback

New Lenox Public Library District Meeting | October 20, 2025 Article Summary: The New Lenox Public Library District Board of Trustees is reviewing a draft of its 2026-2028 Strategic Plan,...
Meeting Briefs

Meeting Summary and Briefs: New Lenox Community Park District for October 15, 2025

New Lenox Community Park District Meeting | October 15, 2025 The New Lenox Community Park District Board of Commissioners on Wednesday, October 15, 2025, discussed plans for a future indoor...
will county board graphic

New Bar Approved in Frankfort Despite Board Opposition

Will County Board Meeting | November 2025 Article Summary: The Will County Board narrowly approved a special use permit for a new bar in Frankfort Township, paving the way for...
joliet junior college logo

JJC Board Approves Grundy County Land Purchase Amid Heated Debate

Joliet Junior College Meeting | November 12, 2025 Article Summary:The Joliet Junior College Board of Trustees voted 6-2 to approve a real estate contract for a new campus in Grundy...
Screenshot 2025-11-21 at 10.20.03 AM

Support Staff Urge Lincoln-Way 210 Board for ‘Fair Contract’ During Public Comment

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: Three members of Lincoln-Way District 210's support staff addressed the Board of Education, voicing frustrations over working without...
New-Lenox-School-122.6

New Lenox SD 122 Approves Community Solar Agreement, Anticipates $62K in Annual Savings

New Lenox School District 122 Meeting | October 21, 2025 Article Summary: New Lenox School District 122 will join a community solar program after the Board of Education approved a...