Trump blasts cost overruns at Obama Presidential Center in Chicago

Trump blasts cost overruns at Obama Presidential Center in Chicago

Spread the love

(The Center Square) – Chicago is back in the mind of President Donald Trump, but this time the commander-in-chief’s focus is on delays and cost overruns at the Obama Presidential Center.

While campaigning for Democratic Party political candidates, former President Barack Obama criticized Trump over White House renovation projects and reductions in federal food assistance.

Trump referred to Obama’s comments during a speech Wednesday at the American Business Forum in Miami.

“‘I’m talking Donald Trump is a mean person.’ I’m not a mean person. I just want to have a country that’s great again, is that OK?” Trump said.

The Obama Presidential Center is scheduled to open next spring on Chicago’s South Side, although the project has been delayed several times and the estimated construction costs have surged from an initial number around $350 million to at least $830 million.

“Ask him how he’s doing on his museum library. He’s got hundreds of millions of dollars of cost overruns. It’s come to a dead halt. He built it in not a particularly good location. He’s not into real estate, you know, he doesn’t know about location,” Trump said.

The president called out Obama again during an unrelated announcement at the White House on Thursday.

“The beautiful Obama building that he’s building in Chicago for the museum, which is now shuttered up, and they couldn’t finish it, what did you say, about five years behind schedule and about 2,000% over budget, then he tells us how to run Medicaid,” Trump said.

The Obama Presidential Center did not immediately respond to a request for comment.

The development has faced criticism from environmental groups and community advocates on Chicago’s South Side. The project resulted in hundreds of trees being cut down in Jackson Park.

Earlier this year, an engineering firm working on the center said claims it racially discriminated against a Black-owned subcontractor on the project were baseless. The New York-City-based engineering firm was responding to a lawsuit accusing it of acting with racist intent when it criticized the alleged underperformance of a Black-owned concrete subcontracting firm. The suit drew national attention to the diversity, equity and inclusion goals connected to the project.

Groundbreaking for the center was held in 2021. According to the Obama Foundation website, the Obama Presidential Center is scheduled to open in 2026.

Catrina Barker and Kevin Bessler contributed to this story.

Leave a Comment





Latest News Stories

Don’t count on lower electricity prices in 2026

Don’t count on lower electricity prices in 2026

By Lauren JessopThe Center Square For 67 million people relying on electricity from the regional power grid, PJM, cheaper utility bills in 2026 are little more than a pipe dream....
NL School District 122 Graphic

District 122 Authorizes $8 Million in Bonds for HVAC; Partners with Park District on Playgrounds

New Lenox School District 122 Board Meeting | Nov. 2025 Article Summary:The School Board moved forward with major capital projects, authorizing the issuance of $8 million in Life Safety Bonds...
Screenshot 2025-12-20 at 12.27.11 PM

Lincoln-Way Board Approves $731,000 Freshman Laptop Purchase

Lincoln-Way Community High School District 210 Meeting | December 18, 2025 Article Summary: The District 210 Board of Education authorized the purchase of 1,750 Lenovo laptops to equip the incoming...
Will County Board Graphic.01

Monee Solar Farm Projects Granted Extensions

Will County Board Meeting | December 18, 2025 Article Summary: The Will County Board granted six-month extensions for two special use permits related to commercial solar energy facilities in Monee...

WATCH: Report: Americans are still paying off credit debt from last Christmas

By Carleen JohnsonThe Center Square If your last-minute Christmas shopping requires a credit card, you are not alone. According to a new WalletHub report, many Americans are still paying off...
Congressional Conflicts: Curb on lawmakers’ stock trades draws fire for being weak

Congressional Conflicts: Curb on lawmakers’ stock trades draws fire for being weak

By Mark StricherzThe Center Square A limited ban on stock trading by Congress might get a vote next year after a 2012 law did not do enough to stem the...
Wyoming's year in review: Education savings, contentious spending

Wyoming’s year in review: Education savings, contentious spending

By Andrew RiceThe Center Square Wyoming lawmakers passed legislation to expand education savings accounts and property tax protections in 2025. However, the legislature remained divided on substantial spending increases to...
U.S. House advances GOP-backed energy reliability bill

U.S. House advances GOP-backed energy reliability bill

By Elyse ApelThe Center Square Legislation looking to lower energy prices nationally successfully passed the U.S. House on a slightly bipartisan vote. H.R. 3628, titled the “State Planning for Reliability...
Illinois’ safe gun storage law goes into effect Jan. 1

Illinois’ safe gun storage law goes into effect Jan. 1

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Components of Illinois Safe Gun Storage Act go into effect Jan. 1. Supporters of Senate Bill 8,...
New-Lenox-School-122.7

New Lenox School Board Approves “Balloon” Tax Levy; Actual Increase Expected at 4.7%

New Lenox School District 122 Board Meeting | Nov. 2025 Article Summary:The New Lenox School District 122 Board of Education approved its 2025 property tax levy following a public hearing....
New Lenox Township.3

New Lenox Township Sets Preliminary Tax Levies; No Public Hearing Required

New Lenox Township Board Meeting | Nov. 13, 2025 Article Summary: The New Lenox Township Board of Trustees determined that the 2025 tax levies for both the township and the...
Sufyan Farhan

Frankfort Man Arrested in Gas Station Robbery Found Hiding in McDonald’s Restroom

Article Summary: Sufyan Farhan, 27, was arrested on December 21 following an armed robbery at a Frankfort Circle K. Deputies located the suspect hiding in a nearby McDonald's restroom after...
New-Lenox-Village-Board.1

Village Moves to Upgrade Police Fleet and Sewer Infrastructure

New Lenox Village Board Meeting | December 15, 2025 Article Summary: The New Lenox Village Board on Monday, Dec. 15, 2025, authorized the purchase of three new police interceptors and...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Executive Committee for December 11, 2025

Will County Board Executive Committee Meeting | December 11, 2025 Overall Meeting SummaryThe Will County Board Executive Committee met on Thursday, December 11, 2025, tackling a diverse agenda that included...
Planning & Zoning Graphic.4

New Lenox Homeowner Granted Variance for 4,000-Square-Foot Accessory Space

Will County Planning and Zoning Commission Meeting | December 16, 2025 Article Summary: A New Lenox homeowner received approval to build a large pole barn that exceeds the county's size limits...