Estimated power demand will outstrip supply by 2032

Estimated power demand will outstrip supply by 2032

Spread the love

(The Center Square) – The impact on electricity demand from a growing number of data centers is a recurring point of concern among energy leaders who warn that, without swift policy reform, unchecked growth could drive up costs and threaten reliability.

A recent briefing hosted by nonprofit consumer watchdog Citizens Utility Board of Illinois, or CUB, explored the issues facing the PJM region.

Panelists from CUB and the Natural Resources Defense Council, or NRDC, suggested potential solutions that would protect consumers and acknowledged an urgent need for coordinated action, they say, to contain costs and safeguard reliability.

CUB’s Jim Chillsen noted that consumers are often unaware their electric bills include capacity charges – payments that cover the power they use, but also the cost of maintaining extra generation for times of peak demand.

He highlighted that after years of flat consumption demand, PJM estimates that by 2031 data centers could add 22-30 GW of new demand, or enough electricity for more than 10 million homes, while expecting only 6-12 GW of new supply, or enough to power as many as 2.6 million homes. This imbalance, he said, has led to record-high capacity prices for which consumers will be paying for through at least May 2027 – something the panelists fear will become a “new normal.”

Without reforms, the NRDC estimates cumulative capacity costs could reach $163 billion from 2027 through 2033.

Claire Lang-Ree, NRDC clean energy advocate, stated that average utility bills have already increased by $20-$30 due to the price increase in the grid’s last auction, and it will get worse through the coming decade if nothing is done. “We’re estimating that average bills could increase by another $70 per month,” she added.

Panelists found fault with PJM’s Critical Issue Fast Path, or CIFP – an initiative launched in August to fast-track discussions and policy decisions aimed at managing rapid growth of large load customers like data centers.

The current proposal, they say, does not require data centers to reduce energy consumption during peak demand; rather, it is voluntary, which increases the risk of rolling blackouts.

They were also critical of the proposed 10-month fast track for new data center-related resources that would allow them to jump ahead in the interconnection queue, which is dominated by clean energy projects – some that have been waiting years for approval.

A better approach stressed Clara Summers, CUB’s Consumers for a Better Grid campaign manager, would require data centers to cover their own costs and bring their own capacity.

Lang-Ree added that by removing large loads out of the capacity market until they bring their own supply may bring capacity prices back down to historic levels of around $60 billion versus the $163 billion projected.

Other measures proposed include implementation of reforms such as separate tariffs, the need for accurate load forecasting, and incentives for new, fast-to-build, clean energy supply.

Stressing that accurate load forecasting is essential to controlling costs and maintaining reliability, she warned that many projects never get built, but their projected demand is used in pricing – driving up capacity pricing for everyone.

By requiring stricter standards such as financial commitments and proof of constructability from developers, consumers won’t be forced to pay for power that is never used, she said.

Summers also highlighted that battery storage is the fastest source to build. Citing analysis by Brattle, she said battery storage can be built in about 20 months or less, as opposed to a gas fired power plant which could take 44 to 50 months. She added that the batteries can store power from today’s resource mix to handle peak capacity needs and are just as reliable as a new gas plant.

Governors of PJM states are among the grid operator’s critics. They recently attended a summit convened by Gov. Josh Shapiro to discuss reforms and having a larger voice in PJM’s governance.

According to PJM, as of August, a total of 46,000 MW of new generation has signed interconnection agreements and are ready to construct, which once operational, could supply as many as 46 million homes. Many of the projects, however, are hampered by factors outside of their control – such as siting and permitting challenges, supply chain backlogs, and financial dynamics.

PJM’s stakeholders are scheduled to vote on a final proposal regarding the allocation of costs for new electric infrastructure on November 19.

Events

No events

Leave a Comment





Latest News Stories

Arizona, Nevada pay less at the pump than California

Arizona, Nevada pay less at the pump than California

By Zachery SchmidtThe Center Square Gas prices in Arizona and Nevada are cheaper than in California for several reasons, according to American Automobile Association spokesperson John Treanor. Factors vary from...
EEOC celebrates 200 days of protecting religious freedom under Trump

EEOC celebrates 200 days of protecting religious freedom under Trump

By Tate MillerThe Center Square The Equal Employment Opportunity Commission is celebrating the ways they’ve protected religious freedom in the workplace over Trump’s past 200 days in office. “These efforts...
U.S. mining operations discarding rare minerals at center of trade talks

U.S. mining operations discarding rare minerals at center of trade talks

By Brett RowlandThe Center Square U.S. mining operations are discarding valuable minerals needed for everything from electric vehicles to missile defense systems that could reduce U.S. dependence on foreign nations....
Duffy warns states to enforce English proficiency requirements for truckers

Duffy warns states to enforce English proficiency requirements for truckers

By Sarah Roderick-FitchThe Center Square California, New Mexico and Washington could risk losing federal funding if they fail to enforce English language proficiency requirements for commercial motor vehicle drivers, U.S....
Illinois quick hits: Chicago businesses at 10-year low; school admin survey closes soon

Illinois quick hits: Chicago businesses at 10-year low; school admin survey closes soon

By Jim Talamonti | The Center SquareThe Center Square Chicago businesses at 10-year low The number of businesses operating in Chicago has reached a 10-year low. Citing city license data,...
Pritzker unveils Illinois LGBTQ hotline amid debate over transgender athletes

Pritzker unveils Illinois LGBTQ hotline amid debate over transgender athletes

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Reports of a transgender student being accepted onto the Conant High School girls volleyball team has...
WATCH: Trump ends funding for cashless bail policies, hedges on Guard deployment to Chicago

WATCH: Trump ends funding for cashless bail policies, hedges on Guard deployment to Chicago

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares some of...
Hochul pushes back on Trump's cashless bail funding threat

Hochul pushes back on Trump’s cashless bail funding threat

By Chris WadeThe Center Square New York Gov. Kathy Hochul is pushing back on President Donald Trump's "reckless" push to do away with cashless bail, saying the move to withhold...
Meeting Briefs

Meeting Summary and Briefs: Will County Board for August 21, 2025

The Will County Board received County Executive Jennifer Bertino-Tarrant’s proposed $791 million budget for fiscal year 2026, which holds the line on the property tax levy while funding key services....
Screenshot 2025-11-03 at 11.20.05 AM

New Lenox Residents Challenge Industrial Rezoning Plan Over Truck Traffic and Safety Concerns

Village of New Lenox Board of Trustees Meeting | August 2025 Article Summary: A proposal by Northern Builders to rezone a 65-acre residential parcel at Laraway and Gougar roads for...
New Lenox Park District.2

Vendors Provide Free Replacements for Defective Park District Golf Equipment

New Lenox Community Park District Meeting | July 2025 Article Summary: The New Lenox Community Park District has secured free replacements for dozens of defective golf cart windshields and a...
Education Department finds GMU Violated Title VI

Education Department finds GMU Violated Title VI

By Esther WickhamThe Center Square The U.S. Department of Education’s Office for Civil Rights announced George Mason University violated federal law by hiring and promoting staff based on race and...
Redistricting opponents immediately appeal to CA voters

Redistricting opponents immediately appeal to CA voters

By Dave MasonThe Center Square Opponents of California’s congressional redistricting argued their case in ads that voters received in their mail immediately before or after the Legislature approved a constitutional...
Former Transportation Secretary urges state taxpayer funding for Chicago transit

Former Transportation Secretary urges state taxpayer funding for Chicago transit

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A former U.S. transportation secretary says Downstate Illinois residents should help fund Chicago transit, but a Metro...
Illinois quick hits: Education tax benefits available; Giannoulias orders license plate reader to shut off access to CBP

Illinois quick hits: Education tax benefits available; Giannoulias orders license plate reader to shut off access to CBP

By Jim Talamonti | The Center SquareThe Center Square Education tax benefits available As students across Illinois return to the classroom, Gov. J.B. Pritzker and the Illinois Department of Revenue...