will county board graphic

Commission Grants Green Garden Solar Farm Project Variance Extension

Spread the love

Will County Planning and Zoning Commission Meeting | November 4, 2025

Article Summary: The Will County Planning and Zoning Commission granted a 180-day extension for two variances related to a commercial solar energy facility in Green Garden Township, allowing the developer to wait for optimal planting conditions in Spring 2026 before proceeding. The variances, originally approved in March, concern the mowing schedule and plant height for the native pollinator habitat required for the project.

Green Garden Solar Farm Key Points:

  • The first-time extension was granted for variances associated with a 35-acre solar project on LaGrange Road near West Manhattan-Monee Road.

  • The variances reduce the required number of mowings from five to one per year and increase the maximum allowed ground cover height from 13 to 36 inches.

  • The developer requested the extension to allow time to prepare the site for planting a native pollinator seed mix in favorable spring conditions.

A commercial solar energy facility planned for Green Garden Township received a procedural timeline extension from the Will County Planning and Zoning Commission on Tuesday, November 4, 2025.

The commission approved a 180-day extension for two variances previously granted to applicant TPE IL WI258, LLC, an affiliate of TPE Development, LLC, for a 35-acre solar farm. The project is located on vacant property at the northeast corner of LaGrange Road and West Manhattan-Monee Road in Monee.

The variances, originally approved by the commission on March 4, 2025, are key to the project’s use of native plantings and agrivoltaics—the simultaneous use of land for agriculture and solar power generation. One variance reduces the required number of mowings from five times per year to just one, while the other increases the maximum allowable plant height from 13 inches to 36 inches. These changes are necessary to establish and maintain a healthy native pollinator habitat on the site, which is a requirement of the state’s community solar program.

According to a memo from county staff, the developer has not yet applied for a building permit because “favorable planting conditions for the site are not expected until after the variances expire on March 4, 2026.” The extension was requested to allow the developer time to prepare the site for planting in the spring of 2026.

The commission, which is authorized to grant up to two 180-day extensions for good cause, approved the request. The variances will now expire on August 31, 2026.

Events

No events

Leave a Comment





Latest News Stories

Screenshot 2025-11-03 at 11.39.46 AM

New Lenox Demands Over $422,000 From Developer to Complete Public Improvements

Village of New Lenox Board of Trustees Meeting | September 22, 2025 Article Summary: The Village of New Lenox is taking formal action to secure funds for unfinished public infrastructure...
new-lenox-fire-district-stations.4

New Lenox Fire District Pays Off Final Loan, Secures $75,000 State Grant

New Lenox Fire Protection District Meeting | August 2025 Article Summary: The New Lenox Fire Protection District has achieved a significant financial milestone by making the final payment on its...
New-Lenox-Sharons-Bay-Park

Damaged Drain Tiles at Bristol Park Face $107,000 Repair Bill

New Lenox Community Park District Meeting | August 2025 Article Summary: A comprehensive survey of the drainage system at Bristol Park has revealed that all of the clay tiles are...
Screenshot 2025-11-03 at 11.31.47 AM

New Lenox and Homer Glen Renew 20-Year Boundary Agreement, Defining Future Growth

Village of New Lenox Board of Trustees Meeting | September 22, 2025 Article Summary: The New Lenox Village Board has approved a new 20-year intergovernmental boundary agreement with the Village...
New-Lenox-School-122.5

New Lenox School Board Reviews $500,000 Nelson Campus Playground Proposal

Meeting Summary and Briefs: New Lenox School District 122 Meeting | August 2025 Article Summary: The New Lenox School District 122 Board of Education reviewed a proposal to partner with...
Joliet-Junior-college.-Graphic-Logo.4

JJC Board Approves Contract with Adjunct Faculty Union

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College (JJC) Board of Trustees approved a new collective bargaining agreement with the Joliet United Adjuncts...
New Lenox Park District.2

New Lenox Park District Golf Course Shatters Records with Busiest July Ever

New Lenox Community Park District Meeting | August 2025 Article Summary: The New Lenox Community Park District's golf course experienced its most successful month on record in July 2025, overcoming...
Meeting Briefs

Meeting Summary and Briefs: New Lenox Township Board of Trustees for August 14, 2025

New Lenox Township Board of Trustees Meeting | August 14, 2025 The New Lenox Township Board focused on community welfare and employee benefits at its meeting on August 14, 2025....
Illinois’ gun ban set for oral arguments in appeals court Monday

Illinois’ gun ban set for oral arguments in appeals court Monday

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – The state of Illinois will be defending its gun and magazine ban Monday in front of the...
Law professor explains why Trump could win tariff case

Law professor explains why Trump could win tariff case

By Brett RowlandThe Center Square The U.S. Supreme Court could side with the Trump administration on a multi-billion dollar case over tariffs despite two lower courts saying the power of...
New Lenox Park District

New Lenox Park District Holds Hearing on Potential $1.5 Million Bond Sale for Future Projects

New Lenox Community Park District Meeting | August 2025 Article Summary: The New Lenox Community Park District is exploring a significant capital funding measure, holding a public hearing on a...
New-Lenox-School-122.6

New Lenox School District 122 Approves $908,900 Equipment Purchase for Tyler Elementary HVAC Overhaul

Meeting Summary and Briefs: New Lenox School District 122 Meeting | August 2025 Article Summary: The New Lenox School District 122 Board of Education has authorized the pre-purchase of $908,900...
Joliet-Junior-college.-Graphic-Logo.3

JJC Board Approves Student Trustee Quorum Policy Amid Heated Debate

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College Board of Trustees passed a controversial policy change allowing the student trustee to be counted...
WATCH: Los Angeles schools superintendent renews contract

WATCH: Los Angeles schools superintendent renews contract

By Esther WickhamThe Center Square The Los Angeles Board of Education unanimously voted this week to renew its four-year contract with Los Angeles Unified School District Superintendent Alberto Carvalho, amid...
Southern California Edison works on paying Eaton Fire victims

Southern California Edison works on paying Eaton Fire victims

By Dave MasonThe Center Square Southern California Edison, which many blamed for starting the destructive Eaton Fire in the Pasadena/Altadena area, is developing a program to reimburse victims. The utility...