New-Lenox-School-122.6

New Lenox School District 122 Approves $908,900 Equipment Purchase for Tyler Elementary HVAC Overhaul

Spread the love

Meeting Summary and Briefs: New Lenox School District 122 Meeting | August 2025

Article Summary: The New Lenox School District 122 Board of Education has authorized the pre-purchase of $908,900 in HVAC equipment for a major renovation at Tyler Elementary School, slated for the summer of 2026. The total project, estimated at over $8.1 million, will modernize the school’s 1980s-era heating and cooling systems and include numerous other building upgrades.

Tyler HVAC Renovation Key Points:

  • The board approved a $908,900 equipment order through the OMNIA Partners Purchasing Cooperative.

  • The total projected cost for the renovation, including installation and other improvements, is $8,148,000.

  • The project will replace the school’s original 1980 heating infrastructure with a modern, energy-efficient V.R.F. system.

  • Additional upgrades will include new ceilings, dimmable LED lighting, a new Public Address system, and a new Fire Alarm System.

The New Lenox School District 122 Board of Education on Tuesday, August 19, 2025, approved a significant first step in a multi-million dollar renovation of Tyler Elementary School, authorizing the pre-purchase of $908,900 in new HVAC equipment. The total project, with an estimated cost of $8,148,000, aims to completely overhaul the school’s mechanical systems during the summer of 2026.

Business Manager/CSBO Robert Groos explained that the equipment must be purchased well in advance to ensure it is delivered before installation work begins. The district is using the OMNIA Partners Purchasing Cooperative to comply with state purchasing laws while securing competitive pricing.

Rob Wroble of Legat Architects presented the project’s design and timeline to the board, detailing the necessity of the upgrades. “Tyler School relies on the original heating system infrastructure which dates back to 1980 when the building was opened,” Wroble’s presentation noted, identifying Tyler as the last of four older district schools to receive such a modernization.

The current system is supplied by centralized hot water boilers and uses original pneumatic tubing, valves, and thermostats for temperature control. The aging infrastructure also includes two air-cooled condensing units and cabinet unit ventilators that are beyond their life expectancy.

The proposed replacement is a Variable Refrigerant Flow (V.R.F.) mechanical system, which separates heating and cooling from ventilation. This design is more energy-efficient as it reduces the need to pre-heat or cool large amounts of outside air. Instead of a boiler and chiller, the V.R.F. system uses heat pumps and circulates refrigerant through a two-pipe network to fan coil units in each room. The district is already familiar with this technology, as it is currently operating in three other schools.

Benefits of the new system, according to the presentation, include lower operating costs, smaller equipment, and excellent temperature and humidity control, with thermostats located in every room.

Beyond the mechanical overhaul, the project will fund a host of other improvements throughout the school. These include new bookshelves and storage cabinets in every classroom, new ceilings with dimmable LED light fixtures, a new Public Address System, and a new Fire Alarm System.

During the meeting, board members asked clarifying questions about the project’s logistics. Member Al Haring inquired about equipment storage, to which Mr. Wroble confirmed it would be stored off-site by the contractor or a third party. In response to a question from Member Nicole DeGrave, Wroble noted that while different companies installed the V.R.F. systems at other schools, the equipment and warranties are the same, ensuring consistency.

The project timeline calls for the board to approve the final construction contracts in December 2025. Final bond financing options to fund the project will be reviewed and approved by the board later in the fall of 2025.

Leave a Comment





Latest News Stories

New-Lenox-School-122.5

New Lenox 122 Eyes Future Budget Cuts to Offset Full-Day Kindergarten Costs, Approves Quad Plus Tax Abatement

New Lenox School District 122 Meeting | February 17, 2026 Article Summary: District officials presented a five-year financial forecast indicating that rising costs, compounded by the upcoming full-day kindergarten mandate, will...
Lincoln Way Central Softball Graphic

Minooka Blasts Five Home Runs to Overpower Lincoln-Way Central 12-2

MINOOKA, Ill. — The Minooka varsity softball team put on an absolute power clinic on Friday afternoon, launching five home runs to dismantle visiting Lincoln-Way Central 12-2 in a non-conference...
Screenshot 2026-05-10 at 4.13.40 PM

New Lenox Seeks $2.5 Million State Loan for Water Main Replacements, Sets $1.2 Million in Sureties for Spencer Meadows

New Lenox Village Board of Trustees Meeting | March 23, 2026 Article Summary: The New Lenox Village Board advanced several major infrastructure initiatives, waiving a second reading to apply for...
New-Lenox-School-122.6

Board Approves $1.04 Million in New Curriculum for New Lenox District 122

New Lenox School District 122 Meeting | February 17, 2026 Article Summary: The District 122 Board authorized five new curriculum adoptions spanning English Language Arts, Spanish, Health, Social Studies, and Math,...
New Lenox Park District

Meeting Summary and Briefs: New Lenox Community Park District Board of Commissioners for February 18, 2026

New Lenox Community Park District Board of Commissioners Meeting | February 18, 2026 The New Lenox Community Park District Board of Commissioners managed a concise agenda during its regular meeting...
New Lenox Township.2

Meeting Summary and Briefs: New Lenox Township Board of Trustees for February 12, 2026

New Lenox Township Board of Trustees Meeting | February 12, 2026 The New Lenox Township Board of Trustees managed a combination of administrative contracts, vendor approvals, and departmental service updates...
Lincoln Way Central Baseball Graphic

Tingley’s Perfect 5-for-5 Day, Shutdown Bullpen Rally Lincoln-Way Central Past Joliet Catholic 13-6

NEW LENOX, Ill. — Facing an early five-run deficit, the Lincoln-Way Central varsity baseball team mounted a spectacular comeback on Wednesday afternoon, scoring 12 unanswered runs to defeat visiting Joliet...
Screenshot 2026-05-10 at 4.13.40 PM

New Lenox Mayor Slams Springfield Affordable Housing Proposal as “Garbage,” Board Passes Opposing Resolution

New Lenox Village Board of Trustees Meeting | March 23, 2026 Article Summary: The New Lenox Village Board unanimously passed Resolution #26-28 supporting municipal housing authority, with Mayor Tim Baldermann...
Arrest.1

Frankfort Man Arrested by State Police for Threatening Governor Pritzker

Article Summary: A 71-year-old Frankfort resident is facing felony and misdemeanor charges after Illinois State Police investigators linked him to a series of threatening voicemails left for Governor JB Pritzker....
Lincoln Way Central Softball Graphic

St. Charles East Blanks Lincoln-Way Central 10-0 Behind Dominant Pitching and Majkszak’s Power

ST. CHARLES, Ill. — The St. Charles East varsity softball team delivered a complete performance on Tuesday afternoon, rolling to a 10-0 non-conference victory over visiting Lincoln-Way Central in a...
will county Committee-Capital Improvement.Graphic

Meeting Summary and Briefs: Capital Improvements & IT Committee for March 3, 2026

Capital Improvements & IT Committee Meeting | March 2026 The Will County Capital Improvements and IT Committee met on Tuesday to address the county's physical and digital infrastructure. The meeting...
New-Lenox-School-122.2

New Lenox District 122 Approves Full-Day Kindergarten for 2027-2028, Extends Teacher Contract

New Lenox School District 122 Meeting | February 17, 2026 Article Summary: The New Lenox School District 122 Board of Education took major steps toward long-term educational planning, passing a resolution...
New Lenox Park District

New Lenox Park District Set to Launch Massive ADA Audits Across Dozens of Local Parks

New Lenox Community Park District Board of Commissioners Meeting | February 18, 2026 Article Summary:The New Lenox Community Park District is launching a comprehensive accessibility audit, with consultants scheduled to...
New Lenox Township.2

New Lenox Township Approves Service Pact with Catholic Charities, Honors Former Trustee Doug Boyd

New Lenox Township Board of Trustees Meeting | February 12, 2026 Article Summary:The New Lenox Township Board of Trustees unanimously approved a formal Service Agreement with Catholic Charities, Diocese of...
Screenshot

Updated: St. John Woman Charged with Nine Counts of Murder in Crete Township Triple Homicide

Article Summary: Jenna Strouble, 30, of St. John, Indiana, has been charged with nine counts of first-degree murder following the shooting deaths of her former partner, Jacob Lambert, and his...