New-Lenox-School-122.6

New Lenox School District 122 Approves $908,900 Equipment Purchase for Tyler Elementary HVAC Overhaul

Spread the love

Meeting Summary and Briefs: New Lenox School District 122 Meeting | August 2025

Article Summary: The New Lenox School District 122 Board of Education has authorized the pre-purchase of $908,900 in HVAC equipment for a major renovation at Tyler Elementary School, slated for the summer of 2026. The total project, estimated at over $8.1 million, will modernize the school’s 1980s-era heating and cooling systems and include numerous other building upgrades.

Tyler HVAC Renovation Key Points:

  • The board approved a $908,900 equipment order through the OMNIA Partners Purchasing Cooperative.

  • The total projected cost for the renovation, including installation and other improvements, is $8,148,000.

  • The project will replace the school’s original 1980 heating infrastructure with a modern, energy-efficient V.R.F. system.

  • Additional upgrades will include new ceilings, dimmable LED lighting, a new Public Address system, and a new Fire Alarm System.

The New Lenox School District 122 Board of Education on Tuesday, August 19, 2025, approved a significant first step in a multi-million dollar renovation of Tyler Elementary School, authorizing the pre-purchase of $908,900 in new HVAC equipment. The total project, with an estimated cost of $8,148,000, aims to completely overhaul the school’s mechanical systems during the summer of 2026.

Business Manager/CSBO Robert Groos explained that the equipment must be purchased well in advance to ensure it is delivered before installation work begins. The district is using the OMNIA Partners Purchasing Cooperative to comply with state purchasing laws while securing competitive pricing.

Rob Wroble of Legat Architects presented the project’s design and timeline to the board, detailing the necessity of the upgrades. “Tyler School relies on the original heating system infrastructure which dates back to 1980 when the building was opened,” Wroble’s presentation noted, identifying Tyler as the last of four older district schools to receive such a modernization.

The current system is supplied by centralized hot water boilers and uses original pneumatic tubing, valves, and thermostats for temperature control. The aging infrastructure also includes two air-cooled condensing units and cabinet unit ventilators that are beyond their life expectancy.

The proposed replacement is a Variable Refrigerant Flow (V.R.F.) mechanical system, which separates heating and cooling from ventilation. This design is more energy-efficient as it reduces the need to pre-heat or cool large amounts of outside air. Instead of a boiler and chiller, the V.R.F. system uses heat pumps and circulates refrigerant through a two-pipe network to fan coil units in each room. The district is already familiar with this technology, as it is currently operating in three other schools.

Benefits of the new system, according to the presentation, include lower operating costs, smaller equipment, and excellent temperature and humidity control, with thermostats located in every room.

Beyond the mechanical overhaul, the project will fund a host of other improvements throughout the school. These include new bookshelves and storage cabinets in every classroom, new ceilings with dimmable LED light fixtures, a new Public Address System, and a new Fire Alarm System.

During the meeting, board members asked clarifying questions about the project’s logistics. Member Al Haring inquired about equipment storage, to which Mr. Wroble confirmed it would be stored off-site by the contractor or a third party. In response to a question from Member Nicole DeGrave, Wroble noted that while different companies installed the V.R.F. systems at other schools, the equipment and warranties are the same, ensuring consistency.

The project timeline calls for the board to approve the final construction contracts in December 2025. Final bond financing options to fund the project will be reviewed and approved by the board later in the fall of 2025.

Events

No events

Leave a Comment





Latest News Stories

Pritzker: Fair maps in Illinois would be 'disarming' to Democrats

Pritzker: Fair maps in Illinois would be ‘disarming’ to Democrats

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Gov. J.B. Pritzker says Democrats would be “disarming” if they agreed to fair maps state by...
States sue over Victims of Crime Act grant funding

States sue over Victims of Crime Act grant funding

By Elyse Apel | The Center SquareThe Center Square (The Center Square) — Colorado Attorney General Phil Weiser has joined a 20-state coalition and Washington, D.C., suing the Trump administration...
Illinois quick hits: COVID fraud indictments issued; man sentenced for mailing fentanyl

Illinois quick hits: COVID fraud indictments issued; man sentenced for mailing fentanyl

By Jim Talamonti | The Center SquareThe Center Square COVID fraud indictments issued A federal grand jury has indicted four Chicago-area individuals accused of fraudulently obtaining millions of dollars in...
WATCH: Illinois In Focus Daily | Thursday Aug. 21st, 2025

WATCH: Illinois In Focus Daily | Thursday Aug. 21st, 2025

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares comments from...
solar panels photovoltaics in solar farm

Will County P&Z Approves Crete Solar Farm, Overruling Township’s General Opposition

Article Summary: The Will County Planning and Zoning Commission recommended approval for a new commercial solar farm in Crete Township, moving the project forward despite being informed by staff of...
P&Z 8.19.25

Will County Board Approves Controversial Recovery Retreat in Crete Township Amid Strong Resident Opposition

Article Summary: The Will County Planning and Zoning Commission approved a special use permit for a long-term residential recovery program on a 68-acre horse farm, despite vocal opposition from Crete...

Will County P&Z: Green Garden Township Variances Granted in Monee

Roy F. Erikson received unanimous approval for two variances for his property at 26409 S. 80th Avenue in Monee. The Will County Planning and Zonning Commission approved reducing the minimum...

Will County P&Z: Manhattan Township Rezoning Approved

The Will County Planning and Zonning Commission unanimously approved a map amendment for a vacant property on South Kankakee Street in Manhattan Township. The request, brought by James and Julie...
Planning & Zoning Graphic.4

Will County P&Z: Green Garden Township Rezoning Approved Amid Concerns Over Lack of a Final Plan

Article Summary: The Will County Planning and Zoning Commission unanimously approved rezoning a large agricultural parcel in Green Garden Township for potential residential development, despite a township official expressing concern...
Two orange map markers on city map

Zoning Commission Overrules Staff, Approves Greeen Garden Twp Variance for 3-Acre Agricultural Lot

Article Summary: The Will County Planning and Zoning Commission approved a variance for a 3-acre lot in an agricultural zone, going against a staff recommendation to deny the request in...
Clearwave

Village-Wide Broadband Service Coming as New Lenox Approves Clearwave Fiber Agreement

Article Summary: New Lenox residents will soon have a new choice for internet service after the Village Board approved a right-of-way use agreement with Clearwave Fiber, which plans to build...
LW SB AUG.1

Lincoln-Way Board Approves Special Education Co-op Budget Amid Concerns Over Rising Costs

Article Summary: The Lincoln-Way District 210 Board of Education approved the Fiscal Year 2026 budget for the Lincoln-Way Special Education District 843 cooperative, while officials expressed concern over significant cost...
LW-SB-AUG.1

Lincoln-Way Board Approves Special Education Co-op Budget Amid Concerns Over Rising Costs

Article Summary: The Lincoln-Way District 210 Board of Education approved the Fiscal Year 2026 budget for the Lincoln-Way Special Education District 843 cooperative, while officials expressed concern over significant cost...
Illinois trucker warns foreign firms faking logs, dodging rules, risking safety

Illinois trucker warns foreign firms faking logs, dodging rules, risking safety

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – After a recent deadly crash in Florida and a crash in Illinois involving semi-trucks, an Illinois...
Illinois law mandates pharmacies to sell needles, sparking safety debate

Illinois law mandates pharmacies to sell needles, sparking safety debate

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The Illinois Governor has signed House Bill 2589, which requires pharmacists to sell sterile hypodermic needles...