Screenshot 2025-11-03 at 11.20.05 AM

New Lenox Residents Challenge Industrial Rezoning Plan Over Truck Traffic and Safety Concerns

Spread the love

Village of New Lenox Board of Trustees Meeting | August 2025

Article Summary: A proposal by Northern Builders to rezone a 65-acre residential parcel at Laraway and Gougar roads for industrial use was met with strong opposition from dozens of residents at the New Lenox Village Board meeting. After a lengthy debate focused on truck traffic, safety, and property values, the board deferred a vote, pressing the developer to agree to conditions that would tie any future building occupancy to the completion of major road improvements.

Cherry Hill Laraway Rezoning Proposal Key Points:

  • Northern Builders is requesting to rezone a 65-acre parcel from residential (R-3) to limited industrial (I-1) to extend the Cherry Hill Business Park.

  • Numerous residents, many from the adjacent Jacob’s Field subdivision, spoke against the project, citing concerns about increased truck traffic, noise, aesthetics, and safety for Lincoln-Way West High School students.

  • Mayor Tim Baldermann and trustees secured a preliminary agreement from the developer to make any future occupancy permit contingent on the completion of the Gougar Road widening and overpass project.

  • The board took no action, as this was a first reading of the ordinance, and the item will return for a potential vote at a future meeting.

Dozens of residents packed the New Lenox Village Hall on Monday, August 25, 2025, to voice strong opposition to a proposed industrial development at the southwest corner of Laraway Road and an extended Gougar Road.

The proposal, brought forward by developer Northern Builders, seeks to rezone a 65-acre parcel from its current residential status to I-1 Limited Industrial for a continuation of the Cherry Hill Business Park. The plan drew extensive criticism from residents who raised concerns about an influx of truck traffic on already congested roads, noise and light pollution, declining property values, and the safety of nearby high school students.

Matthias Trizna of Northern Builders argued the project represents the “highest and best use for the vacant property,” serving as a buffer between future residential areas to the east and the village’s new Water Resource Recovery Facility (WRRF) to the west. He also presented findings from a traffic engineer suggesting that an industrial use would generate 30-50% less traffic during peak hours compared to the currently zoned residential use.

Residents were not convinced. “We don’t really prefer or like to have another giant warehouse right on the doorstep of our community,” said resident Mike Jalo.

Paul, a resident of the Jacob’s Field subdivision, reminded the board that the land was planned for residential development when he built his home nine years ago. Brian, another Jacob’s Field resident, spoke of the impact on his home’s value, stating, “At no point did I ever envision being boxed in by industrial development.”

The primary concern echoed by nearly every speaker was the impact of trucks. Trustee Jim Wilson, who works in logistics, estimated a concept plan for a 900,000-square-foot facility could bring “50 to 150 plus trucks every day.” He stated, “My main concern is how we’re going to correctly or safely get those trucks in and out.”

Mayor Tim Baldermann and the board engaged in a lengthy, detailed discussion with the developers, acknowledging the residents’ “legitimate concerns.” The mayor was firm in stating the village would insist on several conditions not in the original proposal, including a 50-foot setback, extensive landscape berming, and an open-ended requirement for access road construction.

Most critically, Baldermann negotiated a tentative agreement to tie the project’s completion to regional infrastructure improvements. He asked if Northern Builders would have an issue “tying the occupancy of the building on that parcel to either the completion of the Gougar Road widening or a date far enough out where there is no reason Gougar Road shouldn’t be constructed.”

Matthew Grusecki, President of Northern Builders, replied, “I think that’s a reasonable thing for us to agree to.”

The proposal was presented as a first reading, and no vote was taken. Mayor Baldermann told residents the item would return to the board for a final vote at a future meeting, at which time they would have another opportunity to speak.

Leave a Comment





Latest News Stories

Lincoln Way Central Softball Graphic

Lincoln-Way East Powers Past Knights in Conference Clash

The Lincoln-Way Central varsity softball team struggled to contain a high-powered Lincoln-Way East offense on Thursday, falling 15-1 in a conference matchup at home. Lincoln-Way East jumped out to an...
Lincoln Way Central Baseball Graphic

Mid-Game Rally Falls Short as Lincoln-Way Central Drops 7-4 Contest to Lincoln-Way East

Despite a spirited mid-game surge that cut a six-run deficit to two, the Lincoln-Way Central varsity baseball team could not complete the comeback, falling 7-4 to visiting conference rival Lincoln-Way...
NYC schools probed over claims of antisemitism

NYC schools probed over claims of antisemitism

By Chris WadeThe Center Square The Trump administration is investigating claims that New York City schools violated the civil rights of Jewish students by hosting seminars on Palestinian resistance. The...
Illinois Quick Hits: AFP says tax breaks would be more at Soldier Field

Illinois Quick Hits: AFP says tax breaks would be more at Soldier Field

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Americans for Prosperity Illinois says megaprojects legislation that cleared the Illinois House could give a proposed development...
Soldier's insider trading case puts prediction markets to the test

Soldier’s insider trading case puts prediction markets to the test

By Brett RowlandThe Center Square An alleged attempt by a U.S. Army Special Forces soldier to profit from classified military intelligence on a prediction market platform has resulted in the...
U.S. will continue blockade 'as long as it takes,' Hegseth says

U.S. will continue blockade ‘as long as it takes,’ Hegseth says

By Andrew RiceThe Center Square The United States will continue it's blockade in the Strait of Hormuz for "as long as it takes," War Secretary Pete Hegseth said on Friday....
Will County Board Graphic.03

Will County Takes Jurisdiction of Countyline Road in $1.84 Million Agreement with Kankakee County

Will County Board Meeting | April 16, 2026 Article Summary: The Will County Board has approved a jurisdictional transfer that brings a 4.27-mile stretch of Countyline Road entirely under Will...
Will County Board Graphic.01

Green Garden Township’s Wildflower Farm Granted Third Special Use Extension

Will County Board Meeting | April 16, 2026 Article Summary: Bengston Land Management, LLC secured a third extension on its special use permit to host rural events at The Wildflower...
Gori seeks quick end to asbestos fraud, lawsuit ‘bounties' case

Gori seeks quick end to asbestos fraud, lawsuit ‘bounties’ case

By Jonathan Bilyk | Legal NewslineThe Center Square The Gori Law Firm, considered America’s most prolific filer of asbestos personal injury lawsuits, has pushed back on claims it engaged in...
Texas Ten Commandments law may reach Supreme Court

Texas Ten Commandments law may reach Supreme Court

By Esther WickhamThe Center Square A federal appeals court ruling upholding a Texas law requiring Ten Commandments displays in public school classrooms is setting up a potential challenge before the...
Feds reopen probe into LAUSD race-based program

Feds reopen probe into LAUSD race-based program

By Esther WickhamThe Center Square The U.S. Department of Education’s Office for Civil Rights has reopened an investigation into the Los Angeles Unified School District’s Black Student Achievement Plan following...
Trump won't be rushed on Iran as clock ticking for the regime

Trump won’t be rushed on Iran as clock ticking for the regime

By Sarah Roderick-FitchThe Center Square Time is ticking for Iran, as President Donald Trump says he won’t be rushed into giving a timeline regarding the conflict and ceasefire with Iran....
Screenshot 2026-05-10 at 4.26.42 PM

Marathon Petroleum to Cover Contaminated Soil Removal Costs During New Lenox Water Plant Construction

New Lenox Village Board of Trustees Meeting | April 13, 2026 Article Summary: The New Lenox Village Board heard the first reading of an ordinance prohibiting potable water wells near...
Multiple House Republicans defy proposed 3-year FISA Section 702 extension

Multiple House Republicans defy proposed 3-year FISA Section 702 extension

By Thérèse BoudreauxThe Center Square After two attempts last week to reauthorize a controversial spy power of the federal government, House Speaker Mike Johnson, R-La., has unveiled the text of...
Fetterman wants SNAP to cover hot rotisserie chicken

Fetterman wants SNAP to cover hot rotisserie chicken

By John ColeThe Center Square U.S. Sen. John Fetterman, D-Pa., and three of his colleagues have introduced a bill that would allow beneficiaries in the Supplemental Nutrition Assistance Program, or...