The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Leave a Comment





Latest News Stories

WATCH: Lawmakers spar over taxpayer-funded Trump investigation

By Andrew RiceThe Center Square Lawmakers on the U.S. House Judiciary Committee equally slammed and praised former special counsel Jack Smith over his involvement in prosecuting President Donald Trump’s alleged...
Chicago splits pension payments in hopes of Improving cash flow

Chicago splits pension payments in hopes of Improving cash flow

By Glenn Minnis | The Center Square contributorThe Center Square (The Center Square) – Illinois State Rep. Dan Ugaste, R-Saint Charles, worries Chicago’s newfound plan to divide annual advance supplemental...
Adequate preparation missing for GenAI in higher ed

Adequate preparation missing for GenAI in higher ed

By Alan WootenThe Center Square Adequate preparation by university faculty to use generative artificial intelligence for teaching or mentoring is not in place at their respective schools, say 68% of...
Following GOP criticism, Pritzker finds $481.6 million in budget reserves

Following GOP criticism, Pritzker finds $481.6 million in budget reserves

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – The Governor’s Office of Management and Budget says it has identified more than $480 million of budget...
Critics slam Illinois’ $36M park grants as political, wasteful

Critics slam Illinois’ $36M park grants as political, wasteful

By Cat Barker | The Center Square contributorThe Center Square (The Center Square) – The Pritzker administration’s recent announcement of $36 million in state grants for local park projects is...
First arrests made following St. Paul church attack, 'more to come'

First arrests made following St. Paul church attack, ‘more to come’

By Elyse ApelThe Center Square Federal officials have made three arrests in connection with a protest that disrupted a Sunday morning church service in St. Paul. U.S. Attorney General Pamela...
Illinois Quick Hits: Chicago pays OT to potentially ineligible workers

Illinois Quick Hits: Chicago pays OT to potentially ineligible workers

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Chicago’s inspector general has advised the city’s human resources and finance departments that from 2020 through 2024,...
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

50 Donors Sought for Community Blood Drive on Jan. 29

MANHATTAN, IL — The Village of Manhattan has set a goal of securing 50 donors for its upcoming community blood drive, and they are asking residents to roll up their sleeves...
will county board graphic

County Authorizes Condemnation to Advance Francis and Marley Road Improvements

Will County Board Meeting | January 15, 2026 Article Summary: To facilitate safety improvements at the intersection of Francis Road and Marley Road in New Lenox Township, the Will County...
lincoln way school district 210 logo.2

Board Approves 2026-2027 School Calendar

Lincoln-Way 210 Board of Education Meeting | Jan. 15, 2026 Article Summary: The Board of Education adopted the official school calendar for the 2026-2027 academic year. The schedule includes a...
Arizona Senate panel backs renaming highway loop after Kirk

Arizona Senate panel backs renaming highway loop after Kirk

By Dave MasonThe Center Square The Arizona Senate Public Safety Committee voted 4-3 Wednesday afternoon, along party lines, to back a bill renaming highway Loop 202 as the Charlie Kirk...
Index shows top states that support education freedom

Index shows top states that support education freedom

By Esther WickhamThe Center Square The American Legislative Exchange Council released its annual analysis on state education freedom amid the rise in states opting into school choice programs. The Index...
Trump calls off tariffs over Greenland after deal with NATO leader

Trump calls off tariffs over Greenland after deal with NATO leader

By Brett RowlandThe Center Square President Donald Trump called off tariffs on U.S. allies opposed to his plans to annex Greenland after announcing a tentative deal with NATO Secretary General...
Trump rails against European powers at World Economic Forum

Trump rails against European powers at World Economic Forum

By Morgan SweeneyThe Center Square Despite a warm introduction from World Economic Forum Interim Co-Chair Larry Fink and largely friendly opening remarks, President Donald Trump spent most of his address...

WATCH: Advocates urge SCOTUS for uniform gun law guidance

By Andrew Rice and Emily RodriguezThe Center Square Advocates and legal experts urged the U.S. Supreme Court to adopt uniform gun laws across the country after justices heard arguments in...